		  		MARYLAND STATE HIGHWAY ADMINISTRATION           
OFFICE OF HIGHWAY DEVELOPMENT          
DESIGN TECHNICAL SERVICES DIVISION          
707 NORTH CALVERT STREET          
BALTIMORE, MARYLAND 21202          
          
June 5, 2014          
          
Contract No. BA4585172          
F.A.P. No. N/A          
Description: I-695 from MD41           
(Perring Parkway) to MD 147           
(Harford Road)          
          
ADDENDUM NO. 3          
          
To All Purchasers of Contract Documents:          
          
Please be advised that the Bid Opening date for this contract is still scheduled for           
June 19, 2014.          
          
The attention of prospective bidders is directed to the following revisions, additions and/or           
deletions to the Invitation for Bids booklet and Contract Plans.          
          
INVITATION FOR BIDS BOOKLET          
          
Page No. Description          
          
9 REVISED Contract Provision “MBE FOR STRAIGHT STATE CONTRACTS” to           
update MBE sub-goals.          
          
151-159A REPLACED Special Provision “REINFORCED SOIL SLOPE (RSS)” in its entirety.          
          
226 REVISED Special Provision “456 – ARCHITECTUAL TREATMENT”. Location           
“Face of abutments” removed from treatment 456.01.          
          
289-292 REPLACED Special Provision “CLAY BRICK PAVERS ON MORTAR SETTING           
BED” in its entirety.          
          
295A-D ADDED Special Provision “SECTION 611 – DETECTABLE WARNING           
SURFACES FOR CURB RAMPS”.          
          
298A-D ADDED Special Provision “SECTION 704 – TEMPORARY SEED AND           
TEMPORARY MULCH”.          
          
430-474B REPLACED the 24 Inch Water Main Relocation Contract Provisions and Details for           
Construction and Materials in its entirety.          
          
701 REVISED Contract Provision “PROPOSAL FORM PACKET - STATE” to update           
MBE sub-goals.          
          
          
SCHEDULE OF PRICES          
          
Note: For your convenience a NEW abbreviated list has been posted on the SHA Web site at           
www.roads.maryland.gov, under the “Business Center” page, under “Contracts, Bids &           
Proposals – Construction Contracts – Project Quantities.”           
          
Page No. Description          
          
627 INCREASED Quantity of Item No. 1036 (120784) “TEMPORARY ORANGE           
CONSTRUCTION FENCE from 2400 to 2500 LINEAR FEET.          
          
639 INCREASED Quantity of Item No. 3041 (340018) “18 INCH CORRUGATED           
POLYETHYLENE PIPE, TYPE S” from 693 to 773 LINEAR FEET.          
          
DECREASED Quantity of Item No. 3042 (340024) “24 INCH CORRUGATED           
POLYETHYLENE PIPE, TYPE S” from 528 to 496 LINEAR FEET.          
          
645 INCREASED Quantity of Item No. 3073 (388062) “EARTH DIKE” from 196 to           
271 LINEAR FEET.          
          
INSERTED Unit Price and Amount of Item No. 3077 (388130) “QUARTERLY           
EROSION AND SEDIMENT CONTROL INCENTIVE”.          
          
INSERTED Unit Price and Amount of Item No. 3078 (388135) “FINAL EROSION           
AND SEDIMENT CONTROL INCENTIVE”.          
          
646 DECREASED Quantity of Item No. 3079 (388140) “DIVERSION FENCE” from           
311 to 256 LINEAR FEET.          
          
647 INCREASED Quantity of Item No. 3085 (390330) “RIPRAP FOR SEDIMENT           
CONTROL” from 54 to 67 TONS.          
          
DECREASED Quantity of Item No. 3086 (390350) “2 INCH TO 3 INCH STONE           
FOR SEDIMENT CONTROL” from 124 to 116 TONS.          
          
DECREASED Quantity of Item No. 3088 (390535) “SUPER SILT FENCE” from           
5,630 to 4,714 LINEAR FEET.           
          
648A ADDED Item No. 3098 (387150) 2 EACH of “MOUNTABLE BERM”.          
          
656 INCREASED Quantity of Item No. 5009 (504312) “HOT MIX ASPHALT           
SUPERPAVE 19.00MM FOR FULL DEPTH PATCH, PG64-22, LEVEL-2” from           
175 to 220 TON.          
          
668 ADDED Item No. 7014 (715050) 300 LINEAR FEET of “TREE ROOT           
PRUNING”.          
          
ADDED Item No. 7015 (716105) 500 SQUARE YARDS of “TREE INJECTION           
FERTILIZING”.          
SCHEDULE OF PRICES (Continued)          
          
Page No. Description          
          
669 INCREASED Quantity of Item No. 8001 (800000) “24 INCH VERTICAL           
VALVE” from 1 to 2 EACH.          
          
670 INCREASED Quantity of Item No. 8011 (800000) “42 INCH STEEL CASING”           
from 37 to 185 LINEAR FEET.          
          
677 INCREASED Quantity of Item No. 8052 (811408) “8 INCH VALVE AND           
VAULT” from 2 to 3 EACH.          
          
DELETED Quantity of Item No. 8054 (811450) 1 EA of “10 – 12 INCH TAPPING           
SLEAVE & VALVE & VAULT”.          
          
678 DECREASED Quantity of Item No. 8058 (812318) “6 INCH DUCTILE IRON           
PIPE WATER MAIN CLASS 54” from 46 to 30 LINEAR FEET.          
          
DELETED Quantity of Item No. 8059 (812327) 115 LINEAR FEET of “8 INCH           
DUCTILE IRON PIPE WATER MAIN CLASS 56”.          
          
DELETED Quantity of Item No. 8060 (812343) 16 LINEAR FEET of “12 INCH           
DUCTILE IRON PIPE WATER MAIN CLASS 56”.          
          
679 INCREASED Quantity of Item No. 8061 (812383) “24 INCH DUCTILE IRON           
PIPE WATER MAIN CLASS 56” from 550 to 760 LINEAR FEET.          
          
687 ADDED Item No. 8112 (812325) 230 LINEAR FEET of “8 INCH DUCTILE           
IRON PIPE WATER MAIN CLASS 54”.          
          
ADDED Item No. 8113 (812341) 20 LINEAR FEET of “12 INCH DUCTILE           
IRON PIPE WATER MAIN CLASS 54”.          
          
ADDED Item No. 8114 (800000) 1 EACH of “12 X 6 INCH TAPPING SLEEVE &           
6 INCH VALVE & VAULT”.          
          
689 REVISED listing for “AGGREGATE AMOUNT AT UNIT PRICES ALTERNATE           
A IS USING BID”.          
          
CONTRACT PLANS          
          
Sheet No. Description          
          
1 ADDED notes to revision block.          
          
2 ADDED list of revised sheet numbers.          
          
CONTRACT PLANS (continued)          
          
Sheet No. Description          
          
39 REVISED proposed waterline relocation.          
          
43 REVISED proposed waterline relocation.          
          
57 ADDED proposed waterline relocation.          
          
67 REVISED proposed waterline relocation.          
          
71 REVISED proposed waterline relocation.          
          
REVISED temporary traffic control devices and lane locations along Old Harford           
Road to accommodate excavation of proposed waterline on west side of Old Harford           
Road.          
          
ADDED closure of Foster Avenue for construction of proposed waterline including           
necessary traffic control devices.          
          
74 REVISED proposed waterline relocation.          
          
REVISED temporary traffic control devices and lane locations along Old Harford           
Road to accommodate excavation of proposed waterline on west side of Old Harford           
Road.          
          
ADDED closure of Foster Avenue for construction of proposed waterline including           
necessary traffic control devices.          
          
76 REVISED proposed waterline relocation.          
          
79 REVISED proposed waterline relocation.          
          
80-83 REVISED proposed waterline relocation.          
          
102 REVISED Section Y-Y to show a 24” RCPP Barrel.          
          
114 REVISED Area Disturbed under No. 12. SITE INFORMATION.          
          
115 REVISED Sequence of Construction.          
          
116 REVISED Sequence of Construction steps 1 and 2 for clarity.          
          
REVISED step 29 to reflect current plans.          
          
REVISED steps 30 and 31 to reverse order.          
          
CONTRACT PLANS (continued)          
          
Sheet No. Description          
          
116 REVISED step 30 to work from upstream to downstream.          
          
REVISED step 40 for clarity.          
          
REVISED step 45 for clarity.          
          
REVISED Note 2 for clarity.          
          
120 REVISED proposed Erosion and Sediment control measures as a result of the           
revision to the proposed waterline relocation.          
          
124 REVISED proposed Erosion and Sediment control measures as a result of the           
revision to the proposed waterline relocation.          
          
128 REVISED proposed Erosion and Sediment control measures as a result of the           
revision to the proposed waterline relocation.          
          
132 REVISED proposed Erosion and Sediment control measures as a result of the           
revision to the proposed waterline relocation.          
          
136 REVISED LOD point 104.          
          
137 REVISED overall phase 1H reference per ESC changes made on sheets 138 and 139.          
          
138 DELETED the same day stabilization note and hatch pattern.          
          
REVISED location of stabilized construction entrance SCE 1-1 to STA. 1004+00,           
LT.          
          
REVISED quantity note for stabilized construction entrance and rehabilitate           
stabilized construction entrance to reflect new stationing.          
          
DELETED silt fence SF 1-2 from STA. 1003+76, LT to STA. 1005+40.          
          
ADDED super silt fence SSF 1-4 at STA. 1003+75, LT.          
          
ADDED quantity note for super silt fence.          
          
REVISED LOD to extend to STA. 1003+63, LT.          
          
ADDED LOD points table for LOD points.           
          
139 DELETED the same day stabilization note and hatch pattern at STA. 2006+00, LT.          
          
CONTRACT PLANS (continued)          
          
Sheet No. Description          
          
139 REVISED earth dike “DIKE A-2 1-3”, and super silt fence “SSF 1-3” at STA.           
2005+15, RT.          
          
REVISED quantity notes for earth dike and super silt fence near STA. 2005+15, LT.          
          
REVISED super silt fence “SSF 1-2” at STA. 901+07, RT and its quantity notes.          
          
ADDED note No. 5.          
          
140 REVISED overall phase 2H reference per ESC changes made on sheets 141 and 142.          
          
141 ADDED label for EW-2H.          
          
DELETED clear water diversion pipe CWD-24 2-2 at STA. 1005+54, RT.          
          
DELETED portable sediment tank PST 2-2 at STA. 1005+77, RT.          
          
ADDED same day stabilization note and hatching from STA. 1005+73, RT to STA.           
1008+50, RT.          
          
ADDED same day stabilization legend.          
          
142 ADDED same day stabilization note and hatching from STA. 1008+50, RT to STA.           
1009+91, RT.          
          
143 REVISED overall phase 3H reference per ESC changes made on sheet 145          
          
145 ADDED mountable berms MB 3-1 and MB 3-2 at STA. 2003+26, RT and STA.           
2004+92, RT respectively.          
          
REVISED “DIKE A-1 3-1” and “DIKE A-1 3-2” to “DIKE A-2 3-1” and “DIKE A-          
2 3-2” respectively to reflect plans. Shorten earth dikes to stop before mountable           
berms, “MB 3-1” and “MB 3-2”.          
          
ADDED earth dikes, “DIKE A-2 3-3” “DIKE A-2 3-4”, and “DIKE A-2 3-5”, at           
STA. 2003+35, RT, STA. 2004+50, RT, and STA. 2004+04, RT, respectively.          
          
ADDED quantity note for mountable berms.          
          
REVISED quantity note for earth dikes to add new items.          
          
DELETED super silt fence “SSF 3-5” entirely.          
          
ADDED rock outlet protection at STA. 2005+62, RT.          
CONTRACT PLANS (continued)          
          
Sheet No. Description          
          
145 ADDED quantity note for class I riprap for rock outlet protection.          
          
ADDED sandbags at STA. 2005+80, RT. Sandbags will be incidental to the adjacent           
clear water diversion pipes.          
          
REVISED super silt fences “SSF 3-1”, “SSF 3-3”, “SSF 3-4” “SSF 3-6”, and “SSF 3-          
7” so they do not exceed the 50 foot limit on slopes.          
          
ADDED super silt fences “SSF 3-5” at STA. 2005+52, RT.          
          
REVISED super silt fence quantity note to reflect plan changes.          
          
DELETED temporary stone outlet structure “TSOS 3-4”.          
          
DELETED clear water diversion pipe “CWD-18 3-2”.          
          
REVISED clear water diversion pipes “CWD-18 3-1” and “CWD-18 3-3” inlet and           
outfall locations.          
          
REVISED quantity note for clear water diversion pipe to reflect plan changes.          
          
REVISED temporary stone outlet structure “TSOS 3-2” location to STA. 2005+04,           
472.9’ RT.          
          
REVISED quantity note for temporary stone outlet structure to reflect plan changes.          
          
REVISED diversion fence “DF 3-1” location to reflect changes.          
          
REVISED quantity note for diversion fence to reflect plan changes.          
          
146 ADDED Landscape LOD line around proposed landscaping outside Roadway LOD.          
          
147 ADDED Landscape LOD line around proposed landscaping outside Roadway LOD.          
          
ADDED Temporary Orange Construction Fence from STA. 113+50 to STA. 114+36.          
          
148 ADDED Landscape LOD line around proposed landscaping outside Roadway LOD.          
          
REVISED location of proposed Acer ginnala (AG) due to waterline relocation.          
          
149 ADDED Landscape LOD line around proposed landscaping outside Roadway LOD.          
          
152 ADDED Landscape LOD line around proposed landscaping outside Roadway LOD.          
          
CONTRACT PLANS (continued)          
          
Sheet No. Description          
          
152 REVISED location of proposed Acer ginnala (AG) due to waterline relocation.          
          
154-157 ADDED Landscape LOD line around proposed landscaping outside Roadway LOD.          
          
158 REVISED Quantity of Temporary Orange Construction Fence from 2250 to 2350           
LF.          
          
ADDED 300 LF of Tree Root Pruning in the Additional Quantities (Total) box.          
          
ADDED 500 SY of Tree Injection Fertilizing in the Additional Quantities (Total)           
box.          
          
161 REVISED the location of the proposed 24 inch Water Line and the length of the steel           
sleeve.           
          
185 REVISED the Parapet Reinforcing Detail to add additional reinforcing in the deck           
overhang.          
          
216 REVISED to show new valve for the 24 Inch Water Line.          
          
217 REVISED length of the steel sleeve for the 24 inch Water Line.          
          
219 REVISED length of the steel sleeve for the 24 inch Water Line.           
          
247 REVISED proposed waterline relocation.          
          
271 REVISED proposed waterline relocation.          
          
274 REVISED proposed waterline relocation.          
          
287 REVISED proposed waterline relocation.          
          
294-298 REPLACED sheets in their entirety.          
          
CONTRACTOR QUESTIONS          
          
INCLUDED IN THIS RESPONSE ARE CONTRACTOR QUESTIONS RECEIVED AS OF           
6/2/2014.          
          
          
CONTRACTOR QUESTIONS (continued)          
          
The following questions were received from plan purchasers. The responses are provided for           
clarification to all bidders in bold after the questions:          
          
Q 1: The proposed 24” water line is from STA 3+39 to STA 3+78 runs from approximately 9’           
deep to 29’ deep in existing Old Harford Road. Temporary support of excavation will be           
required to install this pipe, but the State’s MOT Plan does not address how to maintain           
traffic while this work is performed. Can the State’s MOT Plan be revised to address the           
utility work in Old Harford Road?          
          
A1: The alignment of the 24” waterline has been updated as part of this addendum.          
          
Q 2: Plan Sheet 102 of 301 (Filter Diaphragm Details) - Section Y-Y shows a 30” Barrel, while           
all the other details show a 24” Barrel.          
          
A2: Section Y-Y has been revised to show a 24” RCCP Barrel.          
          
Q3: Page 226 of special provisions details architectural treatment 456.01 on the face of the           
abutments for Structure S1. Abutment drawings on Sheet S1-9 thru S1-12 do not show           
architectural treatment on the face of the abutments. Is an architectural treatment           
required for the face of the abutments? If so, please provide a detail drawing.          
          
A3: Special Provision “456 – ARCHITECTUAL TREATMENT” has been revised as a           
part of this addendum.          
          
Q4: In reference to Bid Items 3077 and 3078, on previous bids the State has inserted the           
contract prices for the Quarterly and Final Erosion and Sediment Control Incentives. We           
the Sate be providing a revised bid form with the price for these items already filled in?          
          
A4: See revisions to Schedule of Prices sheet number 645.          
          
          
Before submitting your bid, please remove any existing Invitation for Bids pages and Contract           
Plans that have been replaced by this Addendum No. 3, and insert the revised Invitation for Bids           
pages and Contract Plans in their proper sequence. Attach this Addendum letter to the front of           
your Invitation for Bids booklet.          
          
Questions relating to this Addendum No. 3 may be directed in writing to:          
          
Mr. Jason Ridgeway          
Director, Office of Highway Development          
707 North Calvert Street           
Baltimore, Maryland 21202          
ATTN: Mr. Jason Stolicny           
          
If time is of the essence, handwritten questions may be transmitted to FAX No. 410-209-5001.           
All questions are to be addressed to Mr. Jason Stolicny, and the Contractor must identify the           
source of the question and the contract number.          
          
          
DOUGLAS H. SIMMONS, CHIEF ENGINEER/DEPUTY ADMINSTRATOR FOR           
PLANNING, ENGINEERING, REAL ESTATE, AND ENVIRONMENT. REPORT OF           
DELIVERY REQUESTED TO VERIFY THAT THE ADDENDUM WAS RECEIVED,           
PLEASE CALL 410-467-8000.