April 27, 2012          
          
          
Subject: Contract No.FR5045180          
F.A.P. No. AC-BR-236-1(35)E          
Description: Replacement of Bridge No. 10065 on MD 140 over the Monocacy           
River          
          
ADDENDUM NO. 4           
          
TO ALL PURCHASERS OF CONTRACT DOCUMENTS          
          
          
Gentlemen:          
          
The bid opening for this project is not being changed by this addendum.           
The date is still May 3, 2012.          
          
THE FOLLOWING INFORMATION IS IN RESPONSE TO A QUESTION SUBMITTED IN           
WRITING.          
          
Q1: On plan sheet no. 11, the pipe schedule shows 30” RCP IV from I-1 to           
MH-1. The pipe profiles on plan sheet 15 show 24” RCP IV. Which is           
correct?           
          
A1: The pipe schedule on plan sheet no. 11 is correct. The pipe on plan           
sheet 15 is being changed to a 30” RCP IV as part of this addendum.          
          
THE ATTENTION OF PROSPECTIVE BIDDERS IS DIRECTED TO THE FOLLOWING CHANGES           
IN THE INVITATION FOR BIDS AND THE PLANS:          
          
INVITATION FOR BIDS:          
          
Page No. Description          
          
229 Revised the quantity of Item No. 7006 “TURFGRASS SOD           
ESTABLISHMENT” from 2,700 to 3,180 SQUARE YARDS.          
          
PLANS:          
Note: Bidders are directed to make the following “Pen and Ink” changes           
to the Plans. Corrected sheets will be provided after the Contract is           
awarded. Bidders must consider the cost of this change in their bid as           
no additional compensation will be provided when this revision is issued           
after award.          
          
Sheet No. Description          
11 (DP-01) In the pipe profile for I-1 to ES-1, change the size of the           
pile between I-1 and MH-1 from 24” to 30”.          
          
16 (SW-01) Delete the term “modified” in the bio-swale profile title.          
          
17 (SW-02) Delete the term “modified” in the bio-swale profile title.          
          
27 (EP-01) Under the Turfgrass Sod Establishment a quantity block add           
another location from 9+85.00 to 12+50.00 Rt. with a quantity           
of 480 SY. At station 10+00 right, revise the “Seed and           
Mulch, Same day Stabilization” label to “Turfgrass Sod           
Establishment, Same day Stabilization”. Delete the repeated           
“Same day Stabilization” label at Station 11+00 right. In           
the legend at the bottom of the sheet, delete the pattern for           
“Seed and Mulch, Same day Stabilization”.          
          
32 (EP-06) In the legend at the bottom of the plans, add a pattern for           
type “A” soil stabilization matting as shown on plan sheet           
33. Delete pattern at the bottom of this sheet that extends           
beyond the border of the plans.          
          
33 (EP-07) Add “ROP-4” to the 10’ x 10’ Class II Riprap Protection label           
located at Station 25+30.00 Lt.           
          
Please attach this Addendum No. 4 to the front of the Invitation for Bids           
before submitting your bid.           
          
Remove the original above mentioned sheet from the advertised Invitation           
for Bids. This removed sheet is hereby voided. Insert and securely           
fasten the attached sheet in its proper sequence.          
          
Questions concerning this Addendum No. 4 may be directed to our Project           
Engineer - Joseph Navarra at (410) 545-8315.          
          
          
Sincerely,          
          
          
          
Douglas H. Simmons          
Deputy Administrator / Chief Engineer of          
Planning, Engineering, Real Estate and Environment