		  		MARYLAND STATE HIGHWAY ADMINISTRATION           
OFFICE OF HIGHWAY DEVELOPMENT          
DESIGN TECHNICAL SERVICES DIVISION          
707 NORTH CALVERT STREET          
BALTIMORE, MARYLAND 21202          
          
February 19, 2016          
          
Contract No.: WA2785187          
F.A.P. No.: N/A          
Description: Northbound I-81 from           
I-70 to Halfway Blvd Auxiliary Lane           
Improvement          
          
          
ADDENDUM NO.3          
          
To All Purchasers of Contract Documents:          
          
Please be advised that the Bid Opening date for this contract is still scheduled for           
February 25, 2016.          
          
The attention of prospective bidders is directed to the following revisions, additions and/or           
deletions to the Invitation for Bids booklet and Contract Plans.          
          
INVITATION FOR BIDS BOOKLET          
          
Page No. Description          
          
446 REVISED Contract Provisions- Proposal Form Packet---State. On Page 41 of 43           
“(calendar date) from May 31, 2017 to June 30, 2017”.           
          
SCHEDULE OF PRICES          
          
Note: For your convenience all revised Schedule of Prices pages have been posted on the           
eMaryland Marketplace Website at https://emaryland.buyspeed.com/bso/, under “Open           
Bids”, under “Public Works, Park Equipment, and Construction Services”, and under the           
associated “Bid Number” and “Alternate ID”.          
          
Page No. Description          
          
448 INCREASED Quantity of Item No. 3010 (387106) “6 INCH PERFORATED           
CIRCULAR PIPE LONGITUDAL UNDERDRAIN” from 4,130 to 4,270 LINEAR           
FEET.          
          
448 INCREASED Quantity of Item No. 8024 (811003) “FURNISH AND INSTALL           
ELECTRICAL MANHOLE” from 8 to 9 EACH.          
          
          
PEN AND INK CHANGES          
          
Note: The attention of prospective bidders is directed to the following pen and ink changes. The           
Contractor is directed to the make the following pen and ink changes to the contract document.           
Corrected sheets will not be provided.          
          
Sheet No. Description          
          
39 REVISED Note 16 requires that “Removal and resetting of recess pavement           
marking lenses shall be incidental to maintenance of traffic”. To “Removal of           
recess pavement marking lenses shall be incidental to Grinding”.          
          
CONTRACTOR QUESTIONS          
          
INCLUDED IN THIS RESPONSE ARE CONTRACTOR QUESTIONS RECEIVED AS OF           
02/15/2016.          
          
The following questions were received from plan purchasers. The responses are provided for           
clarification to all bidders in bold after the questions:          
          
Q 1: Maryland Wage Rates & Benefits - Washington Cty - Determination #27026: Please provide           
appropriate required hourly wage and benefit rates to be paid for:          
* Rock drill operators.          
* Electricians.          
* Boring machine operators (see pay item 8016 – 4-inch Sch80 Rigid PVC Conduit - Bored).          
          
A1: No Rates are available at the time of bidding. Page 31 specifies how to proceed with           
any classifications not covered in the Invitation for Bids          
          
Q 2: Drilling and Blasting for Rock Removal: Please clarify if drilling and blasting measures will be           
permitted for rock removal.           
          
A2: If drilling and/or blasting is required, a plan must be submitted by the contractor to the           
Office of Materials and Technology, Geotechnical Explorations Division for approval.          
          
Q3: Pay Item 3010: 6-inch Perforated Circular Pipe Longitudinal Underdrain:           
* Drawing No. DE-1 OF 1: By the “Pavement Detail” stationing provided, “Longitudinal           
Underdrain” tallies 2,943-LF.          
* The tally of all call-out-box quantities equals only 2,825-LF of “Longitudinal Underdrain”.           
* Item 3010 bid quantity is 4,130-LF.           
Please clarify and/or correct.          
          
A3: The total amount of pipe for Item # 3010 has been changed to 4270 LF. The total           
differs from the call-out-box quantities for “Longitudinal Underdrain”, because it           
includes the 6 INCH underdrain pipe to be used in the SWM facility.          
          
          
CONTRACTOR QUESTIONS (continued)          
          
Q 4: Special Provision Insert 316 – Stormwater Management Filtration Facilities (pgs. 120 thru 126):           
Paragraph 316.04 states that “Subdrain Pipe” will be measured and paid at the unit price per foot.           
Please provide appropriate pay items, clarify, and/or correct.          
          
A4: Pay item 3010 is to be used.          
          
Q5: Stormwater Management Filtration Facilities:           
* Will lane closures be permitted to construct the Stormwater Management Filtration Facilities           
proposed for the I-81 median?          
* If so, will daytime closures be permitted?          
          
A5: On pg. 68 SP 104.01 Lane & Shoulder closure restrictions specifies.          
          
Q6: Sheet 39 of 79 – MOT – General Notes: Note 16 requires that “Removal and resetting of recess           
pavement marking lenses shall be incidental to maintenance of traffic”.           
* As a matter of reason, since SHA is better suited to determine the required quantities, please           
provide the associated quantities upon which bids will be based.          
* Please consider adding appropriate pay items for this work.           
          
A6: Note 16 will be addressed in this addendum under the Pen & Ink change. Removal           
of recess pavement marking lenses shall be incidental to grinding.          
          
Q7: Note 1 on Drawing No. LS-4 OF 5 requires that broken/torn branches of existing trees along the           
proposed tree protection fence shall be pruned to a height of 12-feet. Please clarify under which           
item this work will be paid.           
          
A7: This work will be incidental to the installation of the tree protective fence.           
          
Q 8: Special Provision No 808 –Lighting Structures: Although described, please confirm that there are           
no high mast poles required for this project.          
          
A8: There are no high mast poles.          
          
Q9: Requirements for Temporary Electrical Service: Please describe what, if any, temporary           
electrical work is required. If required, please clarify the appropriate measurement and payment.          
          
A9: Roadway lighting is to be maintained at all times. Measurement and Payment is           
included under item# 8002 “MAINTAIN EXISTING ROADWAY LIGHTING” On           
pg. 228, SP MAINTAIN EXISTING ROADWAY LIGHTING, describes this.          
          
Q10: Breakaway Base Support System for Lighting Structure is listed on drawing SCH-5 OF 5 with a           
quantity of 7-EA. Please provide an appropriate pay item for this work, or otherwise clarify.           
          
A10: Item# 8029 “BREAKAWAY BASE SUPPORT SYSTEM FOR LIGHTING           
STRUCTURE” is to be used for payment.          
          
          
CONTRACTOR QUESTIONS (continued)          
          
Q11: Pay Item 8024 – Electrical Manholes: While the bid quantity is 8-each, the manhole schedule on           
drawing SCH- 3 of 5 lists 9-each. Please correct or clarify.          
          
A11: Item# 8024 “FURNISH AND INSTALL ELECTRIC MANHOLE” quantity has           
changed from “8” To “9”, in an addendum.          
          
Q12: Fiber Optic Locations vs. Proposed Bio-Swale and W-Beam Improvements: Please confirm that           
there are no existing fiber optic conflicts or other similar interfering existing utilities that will           
require relocation by others.           
          
A12: There are no Fiber Optic Locations in the Median.          
          
          
Questions relating to this Addendum No. 3 may be directed in writing to:          
          
Mr. Barry Ritchie          
Chief, Engineering Systems Team, District 6          
1251 Vocke Road          
LaVale, MD 21502          
ATTN: Mr. Jared Z. Kline          
          
If time is of the essence, handwritten questions may be transmitted to FAX No. 301-729-6968.           
All questions are to be addressed to Mr. Jared Kline, and the Contractor must identify the source           
of the question and the contract number.          
          
          
          
          
GREGORY I. SLATER, ACTING DEPUTY ADMINSTRATOR FOR PLANNING,           
ENGINEERING, REAL ESTATE, AND ENVIRONMENT.           
          
THIS ADDENDUM IS ISSUED TO CLARIFY, ADD TO, DELETE FROM, CORRECT           
AND/OR CHANGE THE BID DOCUMENTS TO THE EXTENT INDICATED AND IS           
HEREBY MADE PART OF THE SAID BID DOCUMENTS ON WHICH THE           
CONTRACT WILL BE BASED. COMAR 21.05.02.08 REQUIRES THAT ALL           
ADDENDA ISSUED BE ACKNOWLEDGED; THEREFORE, PRIOR TO SUBMITTING           
YOUR BID, ATTACH THE ADDENDUM RECEIPT VERIFICATION FORM TO THE           
FRONT OF THE PROPOSAL FORM PACKET. FAILURE TO DO SO MAY RESULT           
IN THE BID BEING DECLARED NON-RESPONSIVE.          
Contract No.: WA2785187          
Addendum No. 3          
February 19, 2016          
Page 4