MARYLAND STATE HIGHWAY ADMINISTRATION          
OFFICE OF HIGHWAY DEVELOPMENT          
DESIGN TECHNICAL SERVICES DIVISION          
707 NORTH CALVERT STREET          
BALTIMORE, MARYLAND 21202          
          
February 8, 2016          
          
Contract No. WA2785187          
F.A.P. No. N/A          
Description: Northbound I-81 from I-70 to Halfway Blvd Auxiliary Lane           
Improvement          
          
ADDENDUM NO. 1          
          
To All Purchasers of Contract Documents:          
          
Please be advised that the Bid Opening date for this contract is still           
scheduled for February 25, 2016.          
          
The attention of prospective bidders is directed to the following           
revisions, additions and/or deletions to the Schedule of Prices and           
Contract Plans.          
          
SCHEDULE OF PRICES          
          
Note: For your convenience all revised Schedule of Prices pages have been           
posted on the eMaryland Marketplace Website at           
https://emaryland.buyspeed.com/bso/, under “Open Bids”, under “Public           
Works, Park Equipment, and Construction Services”, and under the           
associated “Bid Number” and “Alternate ID”.          
          
Page No. Description          
          
385 INCREASED Quantity of Item No. 3005 (302415) “15 INCH           
REINFORCED CONCRETE PIPE, CLASS IV” from 69 to 752 LINEAR           
FEET.          
          
386 INCREASED Quantity of Item No. 3009 (380600) “48 INCH DIAMETER           
MANHOLE FOR 12 INCH TO 24 INCH PIPES- MINIMUM DEPTH” from 3 to           
5 EACH.          
          
DECREASED Quantity of Item No. 3010 (387106) “6 INCH           
PERFORATED CIRCULAR PIPE LONGITUDINAL UNDERDRAIN” from 4,136           
to 4,130 LINEAR FEET.          
          
INCREASED Quantity of Item No. 3011 (387109) “6 INCH CIRCULAR           
PIPE UNDERDRAIN OUTLETS” from 340 to 346 LINEAR FEET.          
          
398A ADDED Item No. 7013 (700000) 41 EACH of “TREE PROTECTIVE           
SLEEVES”.          
          
407 REVISED Listing for “AGGREGATE AMOUNT AT UNIT PRICES          
ALTERNATE A IS USING BID.”          
          
CONTRACT PLANS          
          
Sheet No. Description          
          
1 ADDED Addendum No. 1 notation in revision block and listed           
revised sheets.           
          
9 REVISED Median drainage system. Relabeled MH-2 to be MH-5.          
          
REMOVED I-2.          
          
ADDED additional 15” RCP from MH-5 to match line.          
          
10 REVISED Median drainage system.          
          
ADDED I-3 and MH-4. Added 15” RCP from match line to I-3.          
          
ADDED MH-2 and relabeled I-3 to I-2.          
          
ADDED additional 15” RCP from MH-3 to I-2.          
          
REVISED spacing of Check Dams.          
          
14 REVISED As-Built Inspection Tabulations/Checklist.          
          
ADDED Swales Construction Checklist.          
          
REVISED Structure Schedule to include MH-4 and MH-5.          
          
RELOCATED I-2 and relabeled I-2 to be I-3.          
          
RELABELED MH-2 to be MH-5.          
          
ADDED structure labels for I-3 and MH-4.          
          
REVISED Pipe Schedule Table to include a 15” RCP between I-3           
and MH-4, and between MH-4 and MH-5.          
          
REVISED Check Dam Schedule stationing and number of check           
dams.          
          
REVISED Underdrain outlet length and slope.           
          
REVISED 6” perforated underdrain length and slope.          
          
15 REVISED As-Built Inspection Tabulations/Checklist.          
          
ADDED Swales Construction Checklist.          
          
REMOVED SWM Facility As-Built Certification Data for M-8 Bio-          
Swales table.          
          
CONTRACT PLANS (continued)          
          
Sheet No. Description          
          
15 REVISED Check Dam Schedule stationing.          
          
REVISED 6” perforated underdrain length and slope.          
          
ADDED Labels for I-3 and MH-4.          
          
REVISED Stormwater Management As-Built Certification to show           
BS-2 instead of BS-1.          
          
16 REVISED As-Built Inspection Tabulations/Checklist.          
          
ADDED Swales Construction Checklist.          
          
REVISED Structure Schedule to include MH-2 and MH-3.          
          
RELOCATED I-3 and relabeled I-3 to be I-2.           
          
REVISED Pipe Schedule Table to include a 15” RCP between I-2           
and MH-2, and between MH-2 and MH-3.          
          
REVISED Check Dam Schedule stationing and number of check           
dams.          
          
REVISED Underdrain outlet length and slope.           
          
REVISED 6” perforated underdrain length and slope.          
          
REVISED Stormwater Management As-Built Certification to show           
BS-3 instead of BS-2.          
          
17 REVISED As-Built Inspection Tabulations/Checklist.          
          
ADDED Swales Construction Checklist.          
          
REMOVED SWM Facility As-Built Certification Data for M-8 Bio-          
Swales table.          
          
REVISED Check Dam Schedule stationing and number of check           
dams.          
          
REVISED 6” Perforated underdrain length and slope.          
          
ADDED Labels for I-2 and MH-2.          
          
REVISED Stormwater Management As-Built Certification to show           
BS-4 instead of BS-2.          
          
CONTRACT PLANS (continued)          
          
Sheet No. Description          
          
19 REVISED Bio-Swale Typical Section Design Table to include BS-3           
and BS-4.          
          
ADDED Bio-Swale Recharge Storage Design Table.          
          
20 REVISED Phase 1, Note 1 to include installation of inlets I-2           
and I-3, manholes MH-2, MH-3, MH-4 and MH-5, and the 15 inch           
RCP.          
          
ADDED a revision block.          
          
22 REVISED MH-2 structure label to be MH-5.          
          
DELETED structure label I-2.          
          
REVISED LOD point 216 to include construction of underdrain           
outlet.          
          
23 ADDED structure labels for I-3, MH-4, I-2 and MH-2.          
          
DELETED structure label I-3.          
          
26 REVISED Phase 2 structure label for MH-2 to be MH-5.          
          
DELETED Phase 2 structure label for I-2.          
          
27 ADDED Phase 2 structure labels for I-3, MH-4, I-2 and MH-2.          
          
DELETED Phase 2 structure label I-3.          
          
          
Questions relating to this Addendum No. 1 may be directed in writing to:          
          
Mr. Barry Ritchie          
Chief, Engineering Systems Team, District 6          
707 North Calvert Street          
Baltimore, MD          
ATTN: Jared Z. Kline          
          
If time is of the essence, handwritten questions may be transmitted to           
FAX No. 410-209-5001. All questions are to be addressed to Mr. Jared Z.           
Kline, and the Contractor must identify the source of the question and           
the contract number.          
          
          
          
          
GREGORY I. SLATER, ACTING DEPUTY ADMINSTRATOR FOR PLANNING, ENGINEERING,           
REAL ESTATE, AND ENVIRONMENT.           
          
THIS ADDENDUM IS ISSUED TO CLARIFY, ADD TO, DELETE FROM, CORRECT AND/OR           
CHANGE THE BID DOCUMENTS TO THE EXTENT INDICATED AND IS HEREBY MADE PART           
OF THE SAID BID DOCUMENTS ON WHICH THE CONTRACT WILL BE BASED. COMAR           
21.05.02.08 REQUIRES THAT ALL ADDENDA ISSUED BE ACKNOWLEDGED; THEREFORE,           
PRIOR TO SUBMITTING YOUR BID, ATTACH THE ADDENDUM RECEIPT VERIFICATION           
FORM TO THE FRONT OF THE PROPOSAL FORM PACKET. FAILURE TO DO SO MAY           
RESULT IN THE BID BEING DECLARED NON-RESPONSIVE.