ADDENDUM NO. 1          
          
CONTRACT NO.: BA5005249          
DESCRIPTION: Replacement of the Fuel Systems at the Administration's Hereford Facility           
in Baltimore County          
          
TO ALL PURCHASERS OF CONTRACT DOCUMENTS:          
          
The Bid Opening date for this project is still scheduled for August 13, 2015.          
          
The attention of prospective bidders is directed to the following revisions, additions, and/or           
deletions to the Invitation for Bids Booklet and/or Contract Plan Sheets; the Contractor is directed           
to make any Pen and Ink changes to the Contract Documents as described. Corrected pages/sheets           
will not be provided for Pen and Ink changes:          
          
INVITATION FOR BIDS BOOKLET          
          
Page Revision Description          
          
v REMOVE and INSERT new page revising SECTION 308 to a Special Provisions Insert          
          
vii REMOVE and INSERT new page, adding a Detail          
          
58 REVISE by Pen and Ink Special Provisions; PROJECT DESCRIPTION; 1.1. B. 3. to read:           
“Establish erosion and sediment control in accordance with Contract Documents.”          
          
77-83 REMOVE and INSERT new pages revising sections 1.04 D and E to clarify Bid Items          
          
123 DELETE by Pen and Ink in Special Provisions Section 022200 – EXCAVATION AND FILL,           
Paragraph 3.04 BACKFILLING A.1 in its entirety.          
          
124 REVISE by Pen and Ink in Special Provisions Section 022200 – EXCAVATION AND FILL,           
Paragraph 3.04 BACKFILLING           
C 2. Backfill first sentence to read:           
“Place backfill in loose, uniform horizontal layers as specified in the Contract Documents.          
          
C 3. Selected Compacted Fill first sentence to read: “Place selected compacted fill in loose,           
uniform horizontal layers as specified in the contract documents.”          
D to read: “Aggregate Backfill: Place aggregate backfill in layers and compact each layer as           
specified in the Contract Documents.”          
          
126 DELETE by Pen and Ink Special Provisions Section 024119 – SELECTIVE SITE           
DEMOLITION in 1.02 DESCRIPTION, Related Sections:           
2. Section 312300: Excavating and Filling          
3. Section 312500: Soil Erosion and Sediment Control” in its entirety.          
          
          
          
          
131 ADD by Pen and Ink Special Provisions Section 026500 – UNDERGROUND STORAGE           
TANK REMOVAL, in paragraph 1.5 :          
“C. Submit to the Engineer a Petroleum Storage Tank Removal Plan for each tank system to be           
removed. The plan must be approved by the Engineer prior to the start of any removal work. At           
a minimum the plan shall include identification of site constraints, job hazards, and possible           
ignition sources; procedures should contaminated soil, backfill or liquids be encountered; pipe           
and tank purging and removal procedures; earth retention requirements and methods.”          
          
163 ADD by Pen and Ink Special Provisions Section 220000– FUEL STORAGE AND           
DISPENSING SYSTEM in 2.1 :          
“E. Acceptable Manufacturers:           
          
1. Fireguard® by Highland Tank & Manufacturing Company;           
2. Fireguard® by Hall Tank Co;           
3. Or approved equal.”          
          
165 ADD by Pen and Ink Special Provisions Section 220000– FUEL STORAGE AND           
DISPENSING SYSTEM to the end of 2.04A:          
“…radius. Galvanized steel forms are to be properly prepared and painted “traffic”           
yellow with industrial grade, exterior, epoxy-based paint formulated for use on           
galvanized steel surfaces; 1 primer and 2 finish coats.”          
          
198 ADD by Pen and Ink Special Provisions Section 231311 – WASTE WATER TANK in 2.1:          
“3. Acceptable Manufacturers:           
          
a. Xerxes Corporation;           
b. Containment Solutions, Inc.;           
c. Or approved equal.”          
          
291 REVISE by Pen and Ink in Special Provisions Section 311000 – SITE CLEARING          
3.01 C. 3 to read:           
“3. Dispose of unsuitable top soil as specified in Section 022200 – EXCAVATION AND FILL”          
          
292 REVISE by Pen and Ink in Special Provisions Section 311000 – SITE CLEARING          
3.01 E. 5to read:          
“5. …mechanical or electrical drawings and is included under work of this Contract.           
Removing abandoned underground piping…”          
          
294-311 DELETE by Pen and Ink SECTION 312300 – EXCAVATING AND FILLING in its entirety          
          
336-339 REMOVE and INSERT new pages 336-339 B to include Special Provisions Insert           
“SECTION 308 – EROSION AND SEDIMENT CONTROL”          
          
          
          
SCHEDULE OF PRICES          
          
Note: For your convenience a NEW abbreviated list has been posted on the SHA Web Site, under           
the Contracts, Bids & Proposals: Construction-Contracts Quantities on the "Business With SHA”           
page. This web site can be visited at: www.marylandroads.com.          
          
Page Revision Description          
          
504 REMOVE and INSERT new page, revising Item 8003 Description, Quantity and Units           
of Measurement.          
          
CONTRACT PLANS          
          
Sheet No. Description          
          
1 (Title Sheet) REMOVE and INSERT New sheet, including Final approval stamp for Stormwater           
Management and Sediment and Erosion control           
          
EN-01 REMOVE and INSERT New sheet, including Final approval stamp for Stormwater           
Management and Sediment and Erosion control          
          
ES-01 REMOVE and INSERT New sheet, including Final approval stamp for Stormwater           
Management and Sediment and Erosion control          
          
PRE-BID MEETING MINUTES AND ATTENDANCE SHEET ARE ATTACHED FOR YOUR CONVENIENCE.          
          
Before submitting your bid, please remove any existing Invitation for Bids pages (as applicable)           
that have been replaced by this Addendum, and insert the revised Invitation for Bids pages (as           
applicable) in their proper sequence.           
          
Attach this Addendum letter to the front cover of the Invitation for Bids booklet prior to           
submitting your bid.          
          
Any bidder having questions concerning this contract should contact Galina Bocharov at           
410-582-5568, Fax 410-582-9862.          
          
Failure to comply with these instructions may result in your bid being declared irregular.          
          
          
          
DOUGLAS H. SIMMONS          
CHIEF ENGINEER/DEPUTY ADMINISTRATOR FOR PLANNING,          
ENGINEERING, REAL ESTATE, AND ENVIRONMENT           
          
CONFIRMATION OF THE RECEIPT OF THIS ADDENDUM IS REQUESTED          
EMAIL SHAOOMPROC@SHA.STATE.MD.US          
OR CALL 410-582-5550 OR 410-582-5568          
AS SOON AS ADDENDUM IS RECEIVED