Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Worcester Project Number:WO635_51
US 0113 WORCESTER HIGHWAY IHB - NORTH OF MD 365 TO NORTH OF FIVE MILE BRANCH ROAD - PHASE 4
Status
9/17/2018Grading continues throughout the project as weather permits. Work is underway on the new bridge over Purnell Branch. A closure and detour will be needed to reconstruct the MDDE Railroad crossing just north of the bridge. MDOT SHA will use traditional and social media to communicate closure details.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Complete
Right-of-Way Underway 2020
Construction Spring 2017 Spring 2020
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
9/17/2018Grading continues throughout the project as weather permits. Work is underway on the new bridge over Purnell Branch. A closure and detour will be needed to reconstruct the MDDE Railroad crossing just north of the bridge. MDOT SHA will use traditional and social media to communicate closure details.
 
5/1/2018Grading will dominate the spring/summer work schedule as crews shape the new alignment. Crossroad pipe installations will take place at multiple locations this summer and may require occasional single lane closures or full closures with short detours. SHA will schedule any full closures during off-peak travel times to minimize public impacts.
 
1/17/2018All clearing has been completed in sections 2 and 3 (middle and north). Erosion and sediment control installation is nearly complete. Rough grading for the new highway and access roads will start when temperatures consistently rise above freezing. Stormwater pipe/culvert work will start this spring and require temporary lane shifts, lane closures and flagging operations.
 
11/17/2017Clearing, grubbing, utility work and installation of erosion/sediment controls are underway throughout the project area which encompasses 4.6 miles of US 113 from north of MD 365 (Public Landing Road) to north of Five Mile Branch. This work will continue through the winter.
 
9/3/2017The Maryland Department of Transportation State Highway Administration awarded a $51.4 million design-build construction contract to Allan Myers of Fallston. Initial clearing work will begin in September.
 
1/1/2016Engineering underway. Right-of-Way to begin during current fiscal year. Construction to begin during budget fiscal year.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202