Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Somerset Project Number:SO212_21
MD 0364 DIVIDING CREEK ROAD BRIDGE 1901000 OVER DIVIDING CREEK
Status
8/6/2018Competitive Electronic Bids were opened on August 2, 2018. The apparent low bidder is Marine Technologies Inc. of Baltimore, MD.

 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Underway 2020
Right-of-Way
Construction 2018 2020
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
8/6/2018Competitive Electronic Bids were opened on August 2, 2018. The apparent low bidder is Marine Technologies Inc. of Baltimore, MD.

 
7/3/2018Project advertised for competitive bids 06/26/2018.
 
5/9/2018Final plans have been completed. Awaiting permitting approvals. The design is on schedule to advertise for construction bidding in June 2018.
 
2/6/2018Options to maintain traffic other than a full detour were considered such as maintaining one lane of traffic through a temporary signal system and full closures on weekends only were considered. For various reasons, such as safety and environmental impacts, these options were found to not be feasible. The option to replace the bridge with a full 12 week detour of traffic is the selected method to maintain traffic. The design is on schedule to advertise for construction bidding in June 2018.
 
1/19/2018Project design is still on schedule for completion in June of this year. Presently environmental permits are being developed for approval of the Maryland Department of the Environment and other pertinent regulatory agencies.
 
4/14/2017A public meeting was held on April 5th at the public Library in Pocomoke City. The public was supportive of the bridge replacement project, but had concerns with SHA’s proposed detour during construction. As a result, SHA is re-evaluating accelerated construction alternatives that would minimize the impact of a detour. Options being considered include full detour on weekends only for a limited duration (6 weeks) with a single lane of alternating traffic on weekdays.
 
3/13/2017Please be advised that due to the anticipated inclement weather, the public meeting scheduled for tomorrow evening, March 14, has been postponed until April 5th. The meeting will be held at the Pocomoke Library (conference room) located at 301 Market Street, Pocomoke City, MD 21851 from 5:30 pm to 7:30 pm.
 
1/1/2016Engineering underway.
 


Events

   Informational Public Workshop

Date:

4/5/2017
Location:301 Market Street, Pocomoke City ,MD 21851
 
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202