County:Calvert Project Number:SM351_11
MD 0004 SOLOMONS ISLAND RD/PATUXENT BEACH RD UPGRADE BETWEEN MD 2 AND MD 235
Status
11/6/2017Project planning was completed in 2015. Subsequent phases will proceed as funds become available.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning Complete
Engineering Underway Pending
Right-of-Way
Construction
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
11/6/2017Project planning was completed in 2015. Subsequent phases will proceed as funds become available.
 
6/3/2016The Federal Highway Administration approved the Finding of No Significant Impact(FONSI) for the Selected Alternative in Sept. 2015. This action concludes the project planning process.
 
10/19/2015The Maryland State Highway Administration (SHA) secured Federal Highway Administration (FHWA) Location Approval of SHA's "Selected Alternative on September 10, 2015, concluding the Project Planning Phase of this project.
 
4/14/2015An Informational Public Workshop has been scheduled:

Wednesday, April 22, 2015
Esperanza Middle School
22790 Maple Road
Lexington Park, MD 20653.

There will be no formal presentation. Participants may arrive at any time during workshop hours.
 
3/10/2015The study team is drafting the final environmental document (Finding Of No Significant Impact).
 
12/6/2012Agency concurrence received on the Preferred Alternative.
 
12/6/2010The Public Hearing transcript is available on public display.
 
10/15/2010The study team is currently reviewing the comments received from the public at the Public Hearings. Comments to be included in the formal project record must be submitted to the project team by November 1.
 
9/28/2010Location/Design Public Hearings were held:

Tuesday, September 28, 2010
Patuxent High School
12485 Rousby Hall Road
Lusby, MD 20657

Wednesday, September 29, 2010
Esperanza Middle School
22790 Maple Road
Lexington Park, MD 20653
 
6/11/2010The study team is planning and preparing for the Public Hearings anticipated in Fall 2010.
 
4/2/2010A project newsletter was mailed to residents of the study area, members of the project's mailing list, and property owners along the navigable Patuxent River watershed. A pdf copy is located in the documents section of this webpage.

The study team is also planning and preparing for the Public Hearings anticipated in Fall 2010.
 
2/16/2010The study team is finalizing a newsletter to be distributed throughout the project area that updates residents of the study. The team is also planning and preparing for the public hearings anticipated later this year.
 
9/7/2009The Study Team is currently obtaining the Agencies’ concurrences on the Alternatives Retained for Detailed Study (ARDS) package.

The Study team is also conducting detailed engineering on the ARDS as well as preparing a Newsletter to update the Public on the status of the Project Planning Study.
 
9/7/2009The study team is currently obtaining the Agencies concurrence on the Alternatives Retained for Detailed Study (ARDS) package.

The study team is also conducting detailed engineering on the ARDS as well as preparing a newsletter to update the public on the status of the Project Planning Study.
 
12/22/2008The study team is seeking the Director's concurrence on the selection of Alternatives Retained for Detailed Study.
 
7/21/2008The study team is compiling feedback from the two Alternates Public Workshops and is preparing the Alternatives Retained for Detailed Study.
 
6/16/2008Alternates Public Workshops held:

Monday, June 16, 2008
Dowell Elementary School
12680 H.G. Trueman Road
Lusby, MD 20657

Tuesday, June 17, 2008
Town Creek Elementary School
45805 Dent Drive
Lexington Park, MD 20653
 
3/31/2008The study team is in the process of preparing for the two Alternates Public Workshops, which will be held in June 2008.
 
1/28/2008The study team has compiled the public comments received during the Open Houses held in October, 2007. The results will be displayed at the Alternatives Public Workshop which is tentatively scheduled for early Summer 2008. The study team is moving forward with its preliminary engineering on build alternatives in preparation for the Workshop.
 
11/14/2007The study team is addressing the public comments received during the Open Houses and is developing the build alternatives for the study. Additional studies will be conducted along with preliminary engineering in preparation for the Alternatives Public Workshop scheduled for the Summer 2008.
 
8/29/2007Two Informational Open House sessions were held in October (one in Calvert County and one in St. Mary's County).

These meetings enabled the public to learn more about the study and provide early input.

Calvert County - October 2, 2007
and
St. Mary's County - October 9, 2007
 
3/25/2007The MD 4 Thomas Johnson Bridge project planning study was initiated.
 


Events

 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202