Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Prince George's Project Number:PG083_51
MD 0003 CRAIN HIGHWAY IHB - AT FOREST DRIVE
Status
10/1/2018This project, located in Prince George’s County, is for intersection improvements at MD 3 southbound (Crain Highway) and Forest Drive; beginning at the Intersection of MD 3 southbound and Sylvan Drive and extending in a Southerly direction to 1,900 feet south of Forest Drive for a total distance 0.628 miles.

The work will consist of the following:

(a) Increasing the turning radius at the MD3 southbound / Forest Drive intersection.
(b) Improving the acceleration and deceleration lanes along the outside shoulder of MD 3 southbound.
(c) Providing right-in / right-out access to Forest Drive and left-in only access to the median crossover.
(d) Providing a marked bicycle lane along MD 3 southbound.
(e) Upgrading drainage facilities and providing storm water management.
(f) Upgrading traffic barrier
(g) Full depth pavement widening.
(h) Milling and resurfacing.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Complete
Right-of-Way Underway 2021
Construction Summer 2018 Winter 2020
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
10/1/2018This project, located in Prince George’s County, is for intersection improvements at MD 3 southbound (Crain Highway) and Forest Drive; beginning at the Intersection of MD 3 southbound and Sylvan Drive and extending in a Southerly direction to 1,900 feet south of Forest Drive for a total distance 0.628 miles.

The work will consist of the following:

(a) Increasing the turning radius at the MD3 southbound / Forest Drive intersection.
(b) Improving the acceleration and deceleration lanes along the outside shoulder of MD 3 southbound.
(c) Providing right-in / right-out access to Forest Drive and left-in only access to the median crossover.
(d) Providing a marked bicycle lane along MD 3 southbound.
(e) Upgrading drainage facilities and providing storm water management.
(f) Upgrading traffic barrier
(g) Full depth pavement widening.
(h) Milling and resurfacing.
 
9/18/2018Preliminary activity on this project is expected to begin this fall. For more information about this project, please contact MDOT SHA District 3 Area Engineer Mr. John Gover at wgover@sha.state.md.us
 
8/27/2018NEWS RELEASE

MDOT SHA BEGINS INTERSECTION IMPROVEMENT PROJECT ON CRAIN HIGHWAY IN PRINCE GEORGE’S COUNTY

Project Will Improve Traffic Flow and Enhance Safety on MD 3 in Bowie

Next week, the Maryland Department of Transportation State Highway Administration (MDOT SHA) will begin improvements to MD 3 (Crain Highway) between Forest Drive and Sylvan Drive in Bowie. The $2.9 million project will be complete late fall 2019.

The half-mile project will:

· Increase the turning radius at the southbound MD 3/Forest Drive intersection;

· Extend acceleration and deceleration lanes using the outside shoulder of southbound MD 3;

· Provide right-in/right-out access to Forest Drive and left-in only access to the median crossover;

· Provide a marked bicycle lane on southbound MD 3;
· Upgrade drainage inlets and storm water management facilities; and

· Patch, mill, pave and restripe all travel lanes in the project limits.

Motorists can expect single lane closures on MD 3 Mondays through Fridays between 9 a.m. and 3 p.m. and Sundays through Thursdays between 9 p.m. and 5 a.m. Additional work hours and lane closures may be necessary to expedite all phases of work and keep the project on schedule. MDOT SHA’s contractor, Congressional Contracting, Inc. of Potomac, will guide traffic through the work zone using, barrels, cones and arrow boards.

Approximately 67,000 vehicles use this section of Crain Highway daily, so motorists should expect delays during work hours. Drivers may consider using MD 450 (Annapolis Road) to MD 197 (Collington Road) or to MD 424 (Davidsonville Road) as alternate routes.

While MDOT SHA and its transportation partners work hard to maintain safe traffic mobility in work zones, each driver needs to actively modify his or her driving style to help prevent crashes. Stay alert and look for reduced speed limits, narrow driving lanes and highway workers. Slow down and don’t follow too closely. Work Zone Safety is in Your Hands. For a list of all major MDOT SHA projects, click on Road Ready, MDOT SHA's electronic construction brochure. For a look at real-time commute conditions, log onto www.md511.org.

For more information about this MDOT SHA project, please contact Mr. John Gover, MDOT SHA District 3 Area Engineer at 301.513.7336 or wgover@sha.state.md.us


 
7/2/2018PROJECT DESCRIPTION

This project, located in Prince George’s County, is for intersection improvements at MD 3 southbound (Crain Highway) and Forest Drive; beginning at the Intersection of MD 3 southbound and Sylvan Drive and extending in a Southerly direction to 1,900 feet south of Forest Drive for a total distance 0.628 miles.
The work will consist of the following:

(a) Increasing the turning radius at the MD3 southbound / Forest Drive intersection.

(b) Improving the acceleration and deceleration lanes along the outside shoulder of MD 3 southbound.

(c) Providing right-in / right-out access to Forest Drive and left-in only access to the median crossover.

(d) Providing a marked bicycle lane along MD 3 southbound.

(e) Upgrading drainage facilities and providing storm water management.

(f) Upgrading traffic barrier

(g) Full depth pavement widening.

(h) Milling and resurfacing.

No construction is immediately imminent on this project at this time.
 
1/1/2018Construction to begin during budget fiscal year.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202