County:Montgomery Project Number:MO891_21
US 0029 COLUMBIA PIKE SRI - MUSGROVE ROAD TO FAIRLAND ROAD
Status
5/21/2018Project is on hold
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Underway 2018
Right-of-Way Pending
Construction
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
5/21/2018Project is on hold
 
12/30/2016This project remains on hold as previously noted.
 
10/20/2016The project has been put on hold.
 
8/5/2016The design is approximately 65% complete. Funding is not available for right-of-way or construction.

Soil borings are nearly complete. The activity of performing soil borings involves drilling a hole into the soil to retrieve samples that are then taken to a lab for testing. This information is useful in understanding the underlying properties of the soil, which are needed to appropriately design certain project elements, including stormwater management facilities and retaining walls. The last of the soil borings are currently being drilled on the Verizon property.
 
6/1/2016The design is approximately 50% complete, and is anticipated to be 100% complete by the Fall of 2017. Funding is not available for right-of-way or construction.

Soil borings are ongoing. The activity of performing soil borings involves drilling a hole into the soil to retrieve samples that are then taken to a lab for testing. This information is useful in understanding the underlying properties of the soil, which are needed to appropriately design certain project elements, including stormwater management facilities and retaining walls.

Test pits are complete. The activity of taking test pits involves vacuuming a hole in the ground to visually identify a specific utility and obtain its elevation. Test pits are used to adjust the proposed design to avoid and minimize impacts to utilities.
 
3/17/2016The design is approximately 40% complete, and is anticipated to be 100% complete by the Fall of 2017. Funding is not available for right-of-way or construction.

Soil borings are ongoing. The activity of performing soil borings involves drilling a hole into the soil to retrieve samples that are then taken to a lab for testing. This information is useful in understanding the underlying properties of the soil, which are needed to appropriately design certain project elements, including stormwater management facilities and retaining walls.

Test pits are ongoing. The activity of taking test pits involves vacuuming a hole in the ground to visually identify a specific utility and obtain its elevation. Test pits are used to adjust the proposed design to avoid and minimize impacts to utilities.
 


Events

   Community Informational Meeting

Date:

3/24/2015   (View Document)
Location:14121 Old Columbia Pike, Burtonsville ,MD 20866
 
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202