Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Montgomery Project Number:MO427_21
MD 0355 WISCONSIN AVENUE BRIDGE 15053 OVER LITTLE BENNETT CREEK
Status
8/16/2018Competitive Electronic Bids were opened on August 16, 2018. The apparent low bidder is Concrete General Inc. of Gaithersburg, Maryland.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Underway 2018
Right-of-Way Underway 2021
Construction 2019 2020
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
8/16/2018Competitive Electronic Bids were opened on August 16, 2018. The apparent low bidder is Concrete General Inc. of Gaithersburg, Maryland.
 
7/3/2018Project advertised for competitive bids 06/26/2018.
 
9/7/2017Stream hydraulic analysis is continuing to be refined.
 
3/6/2017Plans are at 30% of development. Coordination with the M-NCPPC is continuing.
 
6/30/2016Coordination with Montgomery County Parks (M-NCPPC) continues to develop stream stabilization alternates that can be approved by the permitting agencies.
 
3/1/2016In conjunction with the bridge replacement, SHA engineers investigated alternatives to reduce the frequency of roadway over-topping due to flooding. The existing road is over-topped by the 25 year flood event. In the preferred alternative, the bridge length was increased and the roadway profile slightly raised in order to pass the 25 year flood event. Other design alternatives, which would not be overtopped by larger, less frequent storm events, required a significant increase in the roadway profile. These alternatives resulted in severe flooding of upstream improved properties, therefore these alternatives were not selected.
 
7/28/2015Engineering underway. Construction to begin during budget fiscal year.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202