Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Montgomery Project Number:MO344_21
MD 0355 ROCKVILLE PIKE MONTROSE PARKWAY FROM MAPLE/CHAPMAN AVENUE TO PARKLAWN DRIVE (PHASE 2)
Status
10/2/2018Project in active design.
- Preliminary Investigation (30% design) was held on December 12, 2012.
- Met with the Planning Board on March 21, 2013. Planning Board voted against the closure of the CSX/Randolph Road highway-railroad crossing.
- Soil borings completed on October 3, 2013.
- Semi Final Review (65% design completion) was held on March 21, 2014.
- Utility Design Start May 2014.
- Right of Way acquistions for total takes initiated by Montgomery County DOT in April 2014.
- Plats for partial takes finalized in February 2015.
- Public Hearing held on July 23, 2015
- Hearing Officer's report completed September 29, 2015
- SHA and MCDOT met with Bethesda Park Condominium property manager on December 05, 2016
Mandatory Referral was held on 12/14/17. Design team is evaluating proposed adjustments.
MDOT SHA has transferred the project to Montgomery County DOT.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning Complete
Engineering Underway 2019
Right-of-Way
Construction
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic: Spring
 
Status Updates
 
10/2/2018Project in active design.
- Preliminary Investigation (30% design) was held on December 12, 2012.
- Met with the Planning Board on March 21, 2013. Planning Board voted against the closure of the CSX/Randolph Road highway-railroad crossing.
- Soil borings completed on October 3, 2013.
- Semi Final Review (65% design completion) was held on March 21, 2014.
- Utility Design Start May 2014.
- Right of Way acquistions for total takes initiated by Montgomery County DOT in April 2014.
- Plats for partial takes finalized in February 2015.
- Public Hearing held on July 23, 2015
- Hearing Officer's report completed September 29, 2015
- SHA and MCDOT met with Bethesda Park Condominium property manager on December 05, 2016
Mandatory Referral was held on 12/14/17. Design team is evaluating proposed adjustments.
MDOT SHA has transferred the project to Montgomery County DOT.
 
3/9/2016The project will now include noise barriers along the Bethesda Park Condominiums, the Randolph Square apartments as well as some of the houses in Brentford Drive as per the Montgomery County Public Hearing officers report.
 


Events

   Location/Design Public Hearing

Date:

7/23/2015
Location:100 Monroe Street, Rockville ,MD 20850
 
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202