Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Kent Project Number:KE438_21
MD 0291 CYPRESS STREET MILLINGTON TOWN LIMITS
Status
4/6/2018The Purpose and Need of the project has been developed and is under review. Upon the approval of the Purpose and Need, the design will be continued to 65%.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Underway 2019
Right-of-Way
Construction 2019 2020
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
4/6/2018The Purpose and Need of the project has been developed and is under review. Upon the approval of the Purpose and Need, the design will be continued to 65%.
 
9/27/2017The design was assigned to a consultant to design the drainage not impacting the mainline water and sewer lines. Test holes were performed to better identify the water and sewer locations and depth. On-street parking issue has been communicated with the Town to better identify the project scope.

The Purpose and Need of the project has been developed and is under review. Upon the approval of the Purpose and Need, the design will be continued to 65%. Right-of-Way is underway.
 
11/16/2016Preliminary Engineering continues. A 65% design is anticipated in January, 2017.
 
2/23/2016Engineering data collection and design activities continue.
 
12/2/2015The 30% design completion meeting was held on October 2, 2015 at the SHA District 2 Office. A utility coordination meeting was held on October 14, 2015 in the Town of Millington. Right-of-way needs have been identified. A design meeting was held on November 23, 2015 and a Task Force meeting was held on November 24, 2015 in the Town of Millington.
 
9/21/2015The 30% design completion meeting is scheduled to take place on October 2, 2015 at the SHA District 2 Office. The next Task Force meeting is scheduled for November 24, 2015 in the Town of Millington.
 
7/17/2015Engineering data collection and preliminary design activities continue.
 
5/12/2015Engineering data collection and preliminary design activities continue. A design meeting was held on March 24, 2015 at the SHA D-2 Office. A Task Force meeting was held on March 26, 2015 in the Town of Millington.
 
1/21/2015Preliminary engineering is underway. Engineering data collection and preliminary design activities have commenced.

A Design Initiation Meeting was held on November 12, 2014. A topographic survey (digital terrain model) was received on July 11, 2014, and mapping of underground utilities on December 15, 2014.
 
1/1/2013Engineering underway.
 


Events

   Task Force/Working Group Meeting

Date:

7/12/2016
Location:185 Sassafras St, Millington ,MD 21651
 
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202