Status
10/16/2017CONSTRUCTION UPDATE - FALL 2017

Crews will continue construction work at the MD 22 (Aberdeen Thruway) / Beards Hill Road intersection this fall, including roadway widening on MD 22.

Please plan ahead for extra travel time on MD 22 in Aberdeen, as there may be temporary lane closures and traffic pattern shifts along MD 22 and on Beards Hill Road near MD 22 during off-peak travel hours (Monday - Friday, and some Saturdays when necessary).

Weather and other construction factors permitting, the pre-construction traffic pattern at the intersection will be restored fall 2017, with the new through lanes on MD 22 open to traffic spring 2018.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Complete
Right-of-Way Complete
Construction Summer 2014 Summer 2018
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic: Spring 2018
 
Status Updates
 
10/16/2017CONSTRUCTION UPDATE - FALL 2017

Crews will continue construction work at the MD 22 (Aberdeen Thruway) / Beards Hill Road intersection this fall, including roadway widening on MD 22.

Please plan ahead for extra travel time on MD 22 in Aberdeen, as there may be temporary lane closures and traffic pattern shifts along MD 22 and on Beards Hill Road near MD 22 during off-peak travel hours (Monday - Friday, and some Saturdays when necessary).

Weather and other construction factors permitting, the pre-construction traffic pattern at the intersection will be restored fall 2017, with the new through lanes on MD 22 open to traffic spring 2018.
 
5/22/2017CONSTRUCTION UPDATE - SPRING 2017

This spring, SHA and the contractor closed one through lane in both directions on Beards Hill Road to complete the roadway widening. The temporary traffic pattern is marked with pavement markings and signage, including directional arrows for turn lanes. Highway construction work is underway on Beards Hill Road both north and south of MD 22.

The temporary lane reductions in effect on Beards Hill Road will be restored to the pre-construction lane configuration by mid-summer 2017.

On May 17, signal technicians extended time on the Beards Hill Road legs of the MD 22/Beards Hill Road intersection. This is a split phase intersection which consists of giving two opposing approaches signal time one after the other rather than concurrently. Split phasing eliminates the left turning conflicts and helps clear more vehicles in each direction.

At the request of the community, traffic engineers also investigated whether additional guidance signs can be safely placed within the work zones to help guide customers to businesses.

On May 18, technicians placed portable variable message signs on MD 22 eastbound and westbound with the two-part message: “ALL STORES OPEN / DURING ROAD WORK”

 
3/28/2017CONSTRUCTION UPDATE - Early Spring 2017

Crews will continue construction work at the MD 22 (Aberdeen Thruway) / Beards Hill Road intersection this spring, including: roadway widening, installation of new storm drain pipe systems and retaining wall construction.

Please plan ahead for extra travel time on MD 22 in Aberdeen, as there may be temporary lane closures and traffic pattern shifts along MD 22 and on Beards Hill Road near MD 22 during off-peak travel hours (Monday - Friday, and some Saturdays when necessary).

Weather and other construction factors permitting, the entire project will be complete late spring 2018.
 
1/13/2017CONSTRUCTION UPDATE - Winter 2017

Crews will continue construction work at the MD 22 (Aberdeen Thruway) / Beards Hill Road intersection this winter as weather permits, including: roadway widening, installation of new storm drain pipe systems and retaining wall construction.

Please plan ahead for extra travel time on MD 22 in Aberdeen, as there may be temporary lane closures and traffic pattern shifts along MD 22 and on Beards Hill Road near MD 22 during off-peak travel hours (Monday - Friday, and some Saturdays when necessary).

Weather and other construction factors permitting, the entire project will be complete spring 2018.
 
11/9/2016CONSTRUCTION UPDATE - Late Fall 2016

Construction work at the MD 22 / Beards Hill Road intersection, including roadway widening, will continue through late fall 2016 and winter 2017 as weather permits.

Please plan ahead for extra travel time on MD 22 in Aberdeen, as there may be temporary lane closures on MD 22 and on Beards Hill Road near MD 22 during off-peak travel hours.

Weather and other construction factors permitting, the entire project will be complete spring 2018.
 
1/1/2016Construction underway.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202