Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Frederick Project Number:FR390_51
MD 0180 JEFFERSON PIKE MD 383 (BROAD RUN ROAD) TO OLD HOLTER ROAD
Status
10/25/2018Current work:
-wedging/leveling and placing base HMA and line striping
-We anticipate having surface paving complete from Old Broad Run Road to Old Middletown Road by late Fall 2018 weather/temperature permitting
-All landscaping (trees/sod) is complete from Old Broad Run Road through to Southview Court, with most other areas complete up through Old Middletown Road
-All sidewalk/median/curb & gutter, concrete driveway entrances and HMA driveway aprons have been completed from Broad Run Road though to Old Middletown Road
-All Stormwater pipes, trench drains, inlets and manholes have been installed from Old Broad Run Rd through to Old Middletown Rd and
-The pipe, end section and rip-rap ditch have been installed and sodded

Upcoming work:
-inlet and pipe placement on the east side of the Old Middletown Rd/MD 180 intersection.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Complete
Right-of-Way Complete
Construction Fall 2017 Winter 2020
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
10/25/2018Current work:
-wedging/leveling and placing base HMA and line striping
-We anticipate having surface paving complete from Old Broad Run Road to Old Middletown Road by late Fall 2018 weather/temperature permitting
-All landscaping (trees/sod) is complete from Old Broad Run Road through to Southview Court, with most other areas complete up through Old Middletown Road
-All sidewalk/median/curb & gutter, concrete driveway entrances and HMA driveway aprons have been completed from Broad Run Road though to Old Middletown Road
-All Stormwater pipes, trench drains, inlets and manholes have been installed from Old Broad Run Rd through to Old Middletown Rd and
-The pipe, end section and rip-rap ditch have been installed and sodded

Upcoming work:
-inlet and pipe placement on the east side of the Old Middletown Rd/MD 180 intersection.
 
6/19/2018This project is currently 34% complete and is set to be fully complete in late fall 2019.

Recently Completed Work/Current work items/areas:
-Curb & Gutter, Sidewalk, and driveway entrances continue being installed, sod placement on West end of project. Sidewalk installation at the area of the elementary school has started, as school in now out for summer recess.

Upcoming work items/areas over the next month:
-Continue installation of curb & gutter, sidewalk and driveway entrances, Install sod and landscape items from Broad Run Road to South View Court.
 
5/15/2018This project is currently 31% complete and is on track to be complete Fall 2019.

Recently completed work (since last newsletter):
Sanitary sewer line complete, Curb & Gutter, Sidewalk, and driveway entrances are being installed, as well as asphalt driveway aprons.

Current work items/areas/Upcoming work items/areas over the next month: Continue installation of curb & gutter, sidewalk and driveway entrances, as well as asphalt driveway aprons. Pave Jefferson Market entrances, as well as main line, from Broad Run Road to South View Court. Install sod and landscape items from Broad Run Road to South View Court.

 
2/14/2018The contractor has completed the vast majority of the tree removal and root pruning throughout the project. The sanitary sewer system continues to be installed, as well as RCP, inlets and manholes. Daily flagging operations continue as needed from 9 am until 3 pm, Monday through Friday.
 
11/28/2017-Crews have completed all pre-construction home surveys.
-The project baseline is being marked and signs are being placed within the project limits.
-Temporary orange construction fence has been placed to protect landscaping items.
-Crews will begin to saw cut the sanitary sewer lines on the West end of town and will work towards Southview.

 
9/22/2017The project has been awarded to L.W. Wolfe Enterprises, Inc.

 
1/1/2016Engineering underway.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202