Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Caroline Project Number:CO558_21
MD 0404 AL MAIN STREET TALBOT COUNTY LINE TO HILLSBORO EASTERN TOWN LIMIT
Status
9/6/2017Right-of-way needs are expected to be finalized by late Fall 2017, followed by a reevaluation of environmental permits. Designs of the Stormwater Management facilities, drainage system, and bridge structure are still underway. The project is not funded for right-of-way or construction at this time.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Underway 2018
Right-of-Way
Construction
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic: Spring
 
Status Updates
 
9/6/2017Right-of-way needs are expected to be finalized by late Fall 2017, followed by a reevaluation of environmental permits. Designs of the Stormwater Management facilities, drainage system, and bridge structure are still underway. The project is not funded for right-of-way or construction at this time.
 
5/31/2017Right-of-way needs are expected to be finalized by late Summer 2017, followed by a reevaluation of environmental permits. Designs of the Stormwater Management facilities, drainage system, and bridge structure are still underway. The project is not funded for right-of-way or construction at this time.
 
3/17/2017Environmental permits are under review. Designs of the Stormwater Management facilities, drainage system, and bridge structure are still underway. The project is not funded for right-of-way or construction at this time.
 
12/22/2016Soil studies have been completed. Design is still underway along with all the required environmental permitting.
 
6/20/2016In-stream soil studies have been completed.

Studies are underway to determine whether asphalt or concrete pavement will be used as part of the roadway reconstruction.
 


Events

   Community Informational Meeting

Date:

10/28/2015
Location:13520 1st St, Queen Anne ,MD 21657
 
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202