Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Carroll Project Number:CL341_51
MD 0030 BU HANOVER PIKE IHB - NORTH WOODS TRAIL TO CSX RAILROAD
Status
7/16/2018This project is currently 28% complete and is set to be fully complete in spring 2020.

Recently completed work (since last newsletter):
-Curb & Gutter, sidewalk N/B MD30 from North Woods Ave to Lower Beckeysville Rd.

Current work items/areas:
- Lower Beckeysville Rd to Ralph Ave S/B- Curb & Gutter, sidewalk and inlets. Lower Beckeysville Rd to Gill Ave – Storm Water pipe/inlets and gas house services. Gill Ave to Hilltop Ave – Gas Main work.

Upcoming work items/areas over the next month:
- Lower Beckeysville Rd to Ralph Ave S/B- Curb & Gutter, sidewalk and inlets. Lower Beckeysville Rd to Gill Ave – Storm Water pipe/inlets. Gill Ave to Hilltop Ave – Gas Main work.

Impacts to traffic:
-There will be times when intersection flagging operations at North Woods Trail, at Lower Beckeysville Rd/ Houcksville Rd or at Gill Ave may cause delays.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Complete
Right-of-Way Underway 2021
Construction Summer 2017 Spring 2020
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
7/16/2018This project is currently 28% complete and is set to be fully complete in spring 2020.

Recently completed work (since last newsletter):
-Curb & Gutter, sidewalk N/B MD30 from North Woods Ave to Lower Beckeysville Rd.

Current work items/areas:
- Lower Beckeysville Rd to Ralph Ave S/B- Curb & Gutter, sidewalk and inlets. Lower Beckeysville Rd to Gill Ave – Storm Water pipe/inlets and gas house services. Gill Ave to Hilltop Ave – Gas Main work.

Upcoming work items/areas over the next month:
- Lower Beckeysville Rd to Ralph Ave S/B- Curb & Gutter, sidewalk and inlets. Lower Beckeysville Rd to Gill Ave – Storm Water pipe/inlets. Gill Ave to Hilltop Ave – Gas Main work.

Impacts to traffic:
-There will be times when intersection flagging operations at North Woods Trail, at Lower Beckeysville Rd/ Houcksville Rd or at Gill Ave may cause delays.
 
6/18/2018This project is currently 26% complete and is expected to be fully complete by Spring 2020.

Recently completed work (since last newsletter):
-Curb & Gutter NB MD30 from Ralph Ave to lower Beckeysville Rd.

Current work items/areas:
-North Woods Trail to Lower Beckeysville Rd
-Storm Drain work, Curb & Gutter and sidewalk
-Gill Ave to Hilltop Ave – Gas Main work

Upcoming work items/areas over the next month:
-North Woods Trail to Lower Beckeysville Rd
–Street Lighting foundations, Storm Drain work, Curb & Gutter and sidewalk
-Gill Ave to Hilltop Ave – Gas main and Gas House connections

-There will be times when intersection flagging operations at North Woods Trail, at Lower Beckeysville Rd/ Houcksville Rd or at Gill Ave may cause delays.
 
5/21/2018The project is 24% complete and will be finished in Spring 2020.

Recently completed work (since last newsletter):
-Inlets NB MD30 from Ralph Ave to lower Beckeysville Rd.

Current work items/areas:
-North Woods Trail to Lower Beckeysville Rd
-Storm Drain work, Curb & Gutter and sidewalk
-Lower Beckeysville Rd to Gill Ave –Gas Main and gas house service work
-Gill Ave to Hilltop Ave – Gas Main work.

Upcoming work items/areas over the next month:
-North Woods Trail to Lower Beckeysville Rd –Street Lighting foundations, Storm Drain work, Curb & Gutter and sidewalk.
-Lower Beckeysville Rd to Gill Ave – Gas main and Gas House connections. Gill Ave to Hilltop Ave – Gas main Work
 
4/16/2018Recently completed work (since last newsletter): Inlets NB MD30 from North Woods Trail to Ralph Ave
Current work items/areas: North Woods Trail to Lower Beckeysville Rd - Storm Drain work, Curb & Gutter and sidewalk. Lower Beckeysville Rd to Gill Ave –Gas Main and gas house service work.
Upcoming work items/areas over the next month: North Woods Trail to Lower Beckeysville Rd – Street Lighting foundations, Storm Drain work, Curb & Gutter and sidewalk. Lower Beckeysville Rd to Gill Ave –Gas main and Gas House connections.
 
3/20/2018Recently completed work-
Traffic Signal Poles @North Woods Trail

Current work items/areas-
North Woods Trail to Lower Beckeysville Rd - Storm Drain work.
Lower Beckeysville Rd to Gill Ave –Gas Main and gas house service work.

Upcoming work items/areas over the next month-
North Woods Trail to Lower Beckeysville Rd – Street Lighting foundations, Storm Drain work, Curb & Gutter.
Lower Beckeysville Rd to Gill Ave –Gas main and Gas House connections.
 
2/20/2018Crews are currently working from North Woods Trail to Ralph Avenue, where they are installing storm water pipes and inlets. Gas line work is also taking place between Ralph Avenue and Gill Avenue. Upcoming work includes traffic signal work at North Woods Trail, installation of curb and gutter, street lighting foundations, sidewalk and storm water pipes and inlets between North Woods Trail and Ralph Avenue. Gas line work will continue to move from Lower Beckleysville Road and Gill Avenue. Motorists and Citizens should plan for extra travel time. Crews may be working in up to four different work zones within the town.
 
1/16/2018Current work items/areas: North Woods Trial to Lower Beckeysville Rd - Storm Drain work, gas line house connections. Lower Beckeysville Rd to Gill Ave – Lighting/ Signal conduit, Gas main work.

Upcoming work items/areas over the next month: North Woods Trail to Lower Beckeysville Rd – Signal/Lighting work, Storm Drain work, Curb & Gutter (Weather permitting), Gas line house connections. Lower Beckeysville Rd to Gill Ave – Lighting/ Signal conduit, Gas main work.
 
12/18/2017Current work items/areas:
- North Woods Trail to Lower Beckleysville Rd - Signal & Lighting work, Storm Drain work
- Lower Beckleysville Rd to Gill Ave - Lighting/ Signal conduit

Upcoming work items/areas over the next month:
- North Woods Trail to Lower Beckleysville Rd – Signal/Lighting work, Storm Drain work, Curb & Gutter, Gas line house connections.
- Lower Beckleysville Rd to Gill Ave – Lighting conduit, Gas main work.
- Gill Ave to MD 482 - Gas main work
 
11/29/2017Gas line work will take place in the roadway next week. (week of 12/4/17) at MD 30 and Gill Ave. Work will take place under a flagging operation.



 
11/22/2017Recently completed work:
-Clearing & Grubbing North Woods Trail to Lower Beckeysville Rd

Current work items/areas:
-North Woods Trail to Lower Beckeysville Rd - Gas line work, Signal & Lighting work, Storm Drain work

Upcoming work items/areas over the next month:
-North Woods Trail to Lower Beckeysville Rd - Gas line work, Signal & Lighting work, Storm Drain work, Curb & Gutter
 
11/1/2017Crews continue to work on the gas line installation and clearing and grubbing.

WEEKEND WORK: November 4- The gas house service contractor will be working on MD 30 this Saturday from 7:00am until 5:00pm with a flagging operation. MDOT SHA will include this in the weekend lane closure listing.
 
10/18/2017The gas line contractor will be closing both northbound and southbound shoulders from Ralph Ave to Lower Beckysville Rd starting Tuesday, 10/25. This will be to be done because the contractor will be placing gas line under the middle of the road and traffic will use the southbound shoulder.
 
10/3/2017Crews are currently installing gas line in the area of North Woods Trail and Lower Beckleysville Rd. Crews are also working on lighting, clearing and grubbing. In the coming month, crews will install new curb and gutter.

 
9/12/2017Crews are currently working on gas line installation as well as clearing and grubbing, in preparation for sidewalk work.

In the coming weeks, crews will begin work on the signal at North Woods Trail. During work, crews may need to use flagging to navigate motorists through the intersection.
 
8/9/2017Crews will begin work the week of August 14th. Gas line work will begin at North Woods Trial.
 
1/1/2013Engineering underway.
 
1/1/2001The project has been awarded to CJ Miller, LLC. Crews are mobilizing and preparing to begin gas line work in late July/ early August.

Pre-construction surveys are also being conducted. Pre-construction surveys consist of meeting with residents and businesses that are in the project limits. Individual meetings will be planned with property owners.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202