Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Charles Project Number:CH203_11
US 0301 CRAIN HIGHWAY MD 227 TO MD 5 SPLIT IN T.B. (CHARLES AND PRINCE GEORGE'S COUNTIES)
Status
9/19/2017The project team is continuing to refine the preliminary alternatives for the project and is evaluating additional concepts to address the transportation safety and mobility needs in this location. If you would like to be placed on the project mailing list and notified of future updates and public meetings for this project, please submit your name and address by email to the Project Manager, using the Feedback tab link.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning Underway 2020
Engineering
Right-of-Way
Construction
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
9/19/2017The project team is continuing to refine the preliminary alternatives for the project and is evaluating additional concepts to address the transportation safety and mobility needs in this location. If you would like to be placed on the project mailing list and notified of future updates and public meetings for this project, please submit your name and address by email to the Project Manager, using the Feedback tab link.
 
8/30/2016An Alternatives Public Workshop is tentatively anticipated in Winter 2016/2017. If you would like to be placed on the project mailing list and notified of the meeting by mail, please submit your name and address by email to the Project Manager, using the Contacts tab link.
 
3/4/2015The US 301/MD 228/MD 5 Business Informational Public Workshop originally scheduled for Thursday, March 5 has been postponed to Thursday, March 12 due to the forecasted inclement weather.
 
1/8/2015The project team has performed initial evaluations along US 301 in Waldorf, which includes a traffic analysis. Public meetings are being planned for both US 301 @ MD 228 and US 301 @ MD 5 (Mattwoman/ Beantown Road) during the first half of 2015.
 
6/4/2014The project team is evaluating preliminary improvement concepts, including short-term and long-term options.
 
1/7/2014The project team is compiling the study area's environmental data and reviewing reviewing information from previous studies.
 
10/29/2013The project team is preparing traffic data.
 
7/1/2013Feasibility study initiated.
 


Events

   Informational Public Workshop

Date:

3/12/2015
Location:3165 John Hanson Drive, Waldorf ,MD 20601
 
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202