Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Cecil Project Number:CE446_52
MD 0272 MAULDIN AVENUE
Status
9/17/2018Work continues on the east side retaining walls and sidewalk. Following some adjustments to the steel girders crews will begin placing reinforcing steel for the first bridge deck concrete pour.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering
Right-of-Way
Construction Spring 2017 Summer 2020
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    Contractor's Information Center
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
9/17/2018Work continues on the east side retaining walls and sidewalk. Following some adjustments to the steel girders crews will begin placing reinforcing steel for the first bridge deck concrete pour.
 
5/1/2018Both abutments have been constructed and five of the seven steel beams spanning the railroad tracks have been set. Work continues on the retaining walls along northbound MD 272. Summer work includes partial bridge deck construction and completion of the retaining walls. This is a staged-construction project; partial demolition of the existing bridge is necessary to complete the new bridge. When the current section is complete SHA will split/shift traffic using both bridges for a short time. This will allow for partial demolition of the existing bridge and construction of the remaining portion of the new bridge and southbound retaining walls.
 
1/17/2018The south side abutment is nearly complete and work is proceeding on the north side abutment. Crews are preparing to pour the north abutment wing walls and begin work on the caissons by early February.
 
11/17/2017Construction of the south side abutment continues. A new (concrete) wing wall has been poured and crews are now shifting to the north side to begin construction of the second abutment. Due to extensive underground utilities initial work on the north side might not proceed at the same pace as the south side abutment. Abutment work will continue through the winter.
 
9/3/2017Crews this summer have been focused on pile driving and installation of retaining wall panels. This work will continue into early fall.
 
1/1/2016Construction underway.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202