Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Cecil Project Number:CE351_51
MD 0222 AIKEN AVENUE BRIDGE 0702700 OVER ROCK RUN
Status
12/5/2017The project has been completed.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Complete
Right-of-Way Underway 2018
Construction Summer 2016 Spring 2018
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
12/5/2017The project has been completed.
 
7/18/2017The project has been completed.
 
5/18/2017This project has been completed.
 
2/21/2017The new MD 222 bridge over Rock Run opened to traffic in early February. Seasonal planting and other minor work will be completed by early spring.
 
12/20/2016Precast deck panels have been installed. Once the new sidewalk is constructed the temporary pedestrian bridge can be removed and the new concrete ride surface will be poured and heated as necessary to ensure proper curing. The bridge will open to vehicle traffic in January.
 
10/19/2016Following the temporary closure of Granite Avenue, relocation of water lines is now underway. This work is being managed by the local water utility (Artesian) and must be done in order for the new bridge substructure to be completed. The new bridge should be completed by mid-November, weather permitting.
 
8/19/2016Following a slight delay, utilities were relocated and bridge demolition began in mid-July. This project will continue on a 10-week schedule. A temporary pedestrian bridge has been installed to facilitate access during construction. Granite Ave. will be temporarily closed at MD 222 to accommodate water/sewer work and enhance safety in the bridge work area.
 
1/1/2013Engineering underway.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202