County:Cecil Project Number:CE283_51
MD 0273 Telegraph Road BRIDGE 0704400 OVER BIG ELK CREEK
Status
1/25/2019Construction is underway and will take place in several phases. Temporary traffic signals should be active by late winter and will control traffic throughout the project. The signals allow SHA to construct the new bridge one half at a time while maintaining both directions of travel. Beneath the bridge, SHA will construct a temporary shelter to maintain Fair Hill NRMA park/trail access. A 30-day closure will be needed to reconstruct the two trails beneath the bridge. Additionally, occasional short-duration trail closures may be needed - SHA and park staff will advertise any closures via signs posted in Fair Hill NRMA parking lots and along the trails.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Underway 2019
Right-of-Way
Construction Fall 2018 Winter 2020
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
1/25/2019Construction is underway and will take place in several phases. Temporary traffic signals should be active by late winter and will control traffic throughout the project. The signals allow SHA to construct the new bridge one half at a time while maintaining both directions of travel. Beneath the bridge, SHA will construct a temporary shelter to maintain Fair Hill NRMA park/trail access. A 30-day closure will be needed to reconstruct the two trails beneath the bridge. Additionally, occasional short-duration trail closures may be needed - SHA and park staff will advertise any closures via signs posted in Fair Hill NRMA parking lots and along the trails.
 
1/1/2018Engineering underway. Construction to begin during budget fiscal year.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202