Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Baltimore Project Number:BA712_51
IS 0695 BALTIMORE BELTWAY AT CROMWELL BRIDGE ROAD
Status
8/8/2018CONSTRUCTION UPDATE - SUMMER 2018

Construction work is getting underway for the drainage and water quality improvements along I-695. Motorists may see crews working along the inner loop of I-695 near the Cromwell Bridge Road and Loch Raven Boulevard interchange ramps.

During construction, most work will take place behind barriers along I-695 or underneath I-695 in the vicinity of Cromwell Bridge Road along Minebank Run.

There may be temporary overnight lane closures on I-695 Sunday - Thursday nights between 7 p.m. and 5 a.m. the next day.

There also may be overnight temporary interchange ramp closures Sunday - Thursday nights between 10 p.m. and 5 a.m. the next day. Advance notice of temporary ramp closures will be posted on portable message boards in the work zone prior to ramp closure dates.

MDOT SHA advises motorists to plan ahead for extra travel time in the vicinity of the interchange and to look ahead for lane closures, changing traffic patterns, crews and equipment moving through the work zone.

Weather permitting, the entire project will be complete late summer 2020.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Underway 2018
Right-of-Way Underway 2022
Construction Summer 2018 Fall 2020
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic: Fall 2020
 
Status Updates
 
8/8/2018CONSTRUCTION UPDATE - SUMMER 2018

Construction work is getting underway for the drainage and water quality improvements along I-695. Motorists may see crews working along the inner loop of I-695 near the Cromwell Bridge Road and Loch Raven Boulevard interchange ramps.

During construction, most work will take place behind barriers along I-695 or underneath I-695 in the vicinity of Cromwell Bridge Road along Minebank Run.

There may be temporary overnight lane closures on I-695 Sunday - Thursday nights between 7 p.m. and 5 a.m. the next day.

There also may be overnight temporary interchange ramp closures Sunday - Thursday nights between 10 p.m. and 5 a.m. the next day. Advance notice of temporary ramp closures will be posted on portable message boards in the work zone prior to ramp closure dates.

MDOT SHA advises motorists to plan ahead for extra travel time in the vicinity of the interchange and to look ahead for lane closures, changing traffic patterns, crews and equipment moving through the work zone.

Weather permitting, the entire project will be complete late summer 2020.
 
3/8/2018MDOT SHA opened bids for the construction contract of the project and the apparent low bidder was Pessoa Construction of Fairmount Heights, MD.
 
1/1/2018Engineering and Right-of-Way underway. Construction to begin during current fiscal year.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202