County:Baltimore Project Number:BA534_51
US 0001 WASHINGTON BLVD IHB - BRIDGE 0300800 OVER CSX
Status
1/28/2019CONSTRUCTION UPDATE - WINTER 2019

The US 1 (Washington Blvd.) bridge over CSX will remain open to traffic during construction work. However, travelers can expect temporary lane closures and traffic shifts in both directions of US 1. Please plan ahead for extra travel time and look ahead for changing traffic patterns and construction personnel and equipment in the work zone.

US 1 access to and from Clark Boulevard will be restricted or detoured at various times during bridge construction work. Dynamic message signs will alert travelers and residents prior to major traffic pattern changes.

Crews will work with temporary lane closures Sunday night through Friday morning between 7 p.m. and 5 a.m. the next day, as well as Monday through Friday between 9 a.m. and 3 p.m. There will be occasional late-night detours of US 1 for steel beam removal and replacement work. Crews may also work along the side of the roadway on the shoulders at other times of the day.

MDOT SHA’s contractor, Lane Construction Company of Glen Burnie, will guide motorists through the work zone using dynamic message signs, traffic barrels and a temporary concrete barrier.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Underway 2018
Right-of-Way Underway 2022
Construction Summer 2018 Spring 2021
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic: Fall 2021
 
Status Updates
 
1/28/2019CONSTRUCTION UPDATE - WINTER 2019

The US 1 (Washington Blvd.) bridge over CSX will remain open to traffic during construction work. However, travelers can expect temporary lane closures and traffic shifts in both directions of US 1. Please plan ahead for extra travel time and look ahead for changing traffic patterns and construction personnel and equipment in the work zone.

US 1 access to and from Clark Boulevard will be restricted or detoured at various times during bridge construction work. Dynamic message signs will alert travelers and residents prior to major traffic pattern changes.

Crews will work with temporary lane closures Sunday night through Friday morning between 7 p.m. and 5 a.m. the next day, as well as Monday through Friday between 9 a.m. and 3 p.m. There will be occasional late-night detours of US 1 for steel beam removal and replacement work. Crews may also work along the side of the roadway on the shoulders at other times of the day.

MDOT SHA’s contractor, Lane Construction Company of Glen Burnie, will guide motorists through the work zone using dynamic message signs, traffic barrels and a temporary concrete barrier.
 
7/19/2018CONSTRUCTION UPDATE - SUMMER 2018

The Maryland Department of Transportation State Highway Administration (MDOT SHA) is beginning a project to replace the US 1 (Washington Boulevard) Bridge over the CSX Transportation rail line in Arbutus, Baltimore County.

Contractor crews will work with temporary lane closures Sunday night through Friday morning between 7 p.m. and 5 a.m. the next day, as well as Monday through Friday between 9 a.m. and 3 p.m.

There will be occasional late-night detours of US 1 for steel beam removal and replacement work. Crews may also work along the side of the roadway on the shoulders at other times of the day.

MDOT SHA’s contractor, Lane Construction Company of Glen Burnie, will guide motorists through the work zone using dynamic message signs, traffic barrels and temporary concrete barriers.

For reports on active lane closures on US 1 and other State highways in Maryland, call 511 on your hands-free cell device or go to www.md511.org
 
1/1/2013Construction to begin during fiscal year 2018.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202