Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Baltimore Project Number:BA515_21
US 0001 BELAIR ROAD BALTIMORE CITY LINE TO I-695 (BALTIMORE BELTWAY)
Status
9/9/2016This project has been put on hold due to lack of funding.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Underway 2019
Right-of-Way Underway 2020
Construction
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
9/9/2016This project has been put on hold due to lack of funding.
 
6/21/2016Soil borings have been completed. The activity of getting soil samples involves drilling a hole into the soil to retrieve samples that are then taken to a lab for testing. This information is useful in understanding the underlying properties of the soil, which are needed to design certain project elements, including stormwater management facilities and retaining walls.
 
1/8/2016Approximately 65% design has been completed. Right of way acquisitions along the corridor needed for project construction activities will likely begin within the next few months.
 
10/13/2015Test pits have been completed. The activity of taking test pits involves vacuuming a hole in the ground to visually identify a specific utility and get its elevation. Test pits are used to adjust the proposed design so it avoids and minimizes impacts to utilities.

Soil borings are ongoing. The activity of getting soil samples involves drilling a hole into the soil to retrieve samples that are then taken to a lab for testing. This information is useful in understanding the underlying properties of the soil, which are needed to appropriate design certain project elements, including stormwater management facilities and retaining walls.
 
7/17/2015The 30% design was completed in February, 2015. Soil borings are underway to determine the characteristics of the underlying soil at specific locations. Also, crews will be out in the field verifying the type and depth of utilities at specific locations so the proposed design and avoid and minimize impacts to those utilities.
 
10/15/2014Concept design was completed and approved in 2007. The project was reinitiated in 2013 and 30% design is expected to be completed by January of 2015.

 


Events

   Task Force/Working Group Meeting

Date:

9/23/2014   (View Document)
Location:6105 Kenwood Avenue, Rosedale ,MD 21237
 
   Community Event/Meeting

Date:

3/13/2014   (View Document)
Location:5401 Kenwood Avenue, Baltimore ,MD 21206
 
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202