County:Baltimore Project Number:BA145_21
PUTTY HILL ROAD PUTTY HILL ROAD OVER I-695 - (BRIDGE 0317400)
Status
4/26/2018MDOT SHA will be selecting a contractor for this project as part of the Construction Management at Risk (CMAR) project delivery system. Using CMAR, the MDOT SHA is able to utilize the Contractor’s expertise as the project’s design is finalized to reduce construction costs through enhanced certainty in risks, schedules, and construction means and methods. Proposals were received on April 3, 2018 and are currently being evaluated.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Underway 2018
Right-of-Way
Construction
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
4/26/2018MDOT SHA will be selecting a contractor for this project as part of the Construction Management at Risk (CMAR) project delivery system. Using CMAR, the MDOT SHA is able to utilize the Contractor’s expertise as the project’s design is finalized to reduce construction costs through enhanced certainty in risks, schedules, and construction means and methods. Proposals were received on April 3, 2018 and are currently being evaluated.
 
1/25/2018A coordination meeting with utility companies will be held at the end of January to determine how impacted facilities will be maintained or relocated during construction.
 
10/2/2017This project is progressing towards Preliminary Investigation. Design is at approximately 30%.
 
1/1/2016Engineering underway.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202