County:Baltimore Project Number:BA038_51
IS 0083 HARRISBURG EXPRESSWAY IHB - BRIDGE 03062 OVER PADONIA ROAD
Status
9/20/2018CONSTRUCTION UPDATE - FALL 2018

MDOT SHA and the contractor, Milani Construction, have closed the left-turn ramp from eastbound Padonia Road to northbound I-83 for 24 hours a day, seven days a week for the duration of the bridge construction work.

Motorists traveling from Mays Chapel to northbound I-83 and destinations north of Hunt Valley will be detoured past the interchange to right on southbound Deereco Road/Greenspring Drive to right on the Timonium Road interchange ramp to northbound I-83. The other interchange ramps will remain open during weekday peak travel hours.

Padonia Road is narrowed to one lane eastbound and two lanes westbound in the interchange area during bridge construction work.

There will be late-night temporary interchange ramp closures and traffic stops/detours on Padonia Road when needed for activities such as bridge demolition and support beam setting may take place between 10 p.m. and 5 a.m. the next morning.

On I-83, there will be night-time lane closures during construction, Sunday- Thursday nights between 10 p.m. and 5 a.m. the next day.

No temporary lane closures or interchange ramp closures will occur on I-83 during the annual Maryland State Fair.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Underway 2019
Right-of-Way
Construction Summer 2018 Fall 2021
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic: Summer 2021
 
Status Updates
 
9/20/2018CONSTRUCTION UPDATE - FALL 2018

MDOT SHA and the contractor, Milani Construction, have closed the left-turn ramp from eastbound Padonia Road to northbound I-83 for 24 hours a day, seven days a week for the duration of the bridge construction work.

Motorists traveling from Mays Chapel to northbound I-83 and destinations north of Hunt Valley will be detoured past the interchange to right on southbound Deereco Road/Greenspring Drive to right on the Timonium Road interchange ramp to northbound I-83. The other interchange ramps will remain open during weekday peak travel hours.

Padonia Road is narrowed to one lane eastbound and two lanes westbound in the interchange area during bridge construction work.

There will be late-night temporary interchange ramp closures and traffic stops/detours on Padonia Road when needed for activities such as bridge demolition and support beam setting may take place between 10 p.m. and 5 a.m. the next morning.

On I-83, there will be night-time lane closures during construction, Sunday- Thursday nights between 10 p.m. and 5 a.m. the next day.

No temporary lane closures or interchange ramp closures will occur on I-83 during the annual Maryland State Fair.
 
9/11/2018INTERCHANGE TRAFFIC ALERT - UPDATED

New Date: Eastbound Padonia Road Ramp to I-83 North to close Wednesday night September 19.

Weather permitting, MDOT SHA and the contractor, Milani Construction, will re-stripe Padonia Road in the vicinity of the I-83 interchange on Wednesday night, September 19, and close the left-turn ramp from eastbound Padonia Road to northbound I-83 for 24 hours a day, seven days a week for the duration of the bridge construction work.

As of early Thursday morning, September 20, motorists traveling from Mays Chapel to northbound I-83 and destinations north of Hunt Valley will be detoured past the interchange to right on southbound Deereco Road/Greenspring Drive to right on the Timonium Road interchange ramp to northbound I-83.

The other interchange ramps will remain open during weekday peak travel hours.

Padonia Road will be narrowed to one lane eastbound and two lanes westbound in the interchange area during bridge construction work.

Late night temporary interchange ramp closures and traffic stops/detours on Padonia Road for activities such as bridge demolition and support beam setting may take place between 10 p.m. and 5 a.m. the next morning.

There will be night-time lane closures on I-83 during construction. No temporary lane closures or interchange ramp closures will occur on I-83 during the annual Maryland State Fair.
 
9/6/2018TRAFFIC ALERT - Eastbound Padonia Road Ramp to I-83 North to Close September 12 for Bridge Construction

On the night of Wednesday, September 12, MDOT SHA and the contractor, Milani Construction, will close the left-turn ramp from eastbound Padonia Road to northbound I-83 for 24 hours a day, seven days a week for the duration of the bridge construction work.

As of early Thursday morning, September 13, motorists traveling from Mays Chapel to northbound I-83 and destinations north of Hunt Valley will be detoured past the interchange to right on southbound Deereco Road/Greenspring Drive to right on the Timonium Road interchange ramp to northbound I-83.

The other interchange ramps will remain open during weekday peak travel hours.

Padonia Road will be narrowed to one lane eastbound and two lanes westbound in the interchange area during bridge construction work.

Late night temporary interchange ramp closures and traffic stops/detours on Padonia Road for activities such as bridge demolition and support beam setting may take place between 10 p.m. and 5 a.m. the next morning.

There will be night-time lane closures on I-83 during construction. No temporary lane closures or interchange ramp closures will occur on I-83 during the annual Maryland State Fair.
 
7/19/2018CONSTRUCTION UPDATE - SUMMER 2017

In late summer 2018, Milani Construction, LLC of Hagerstown will begin the project to replace of the existing dual bridge on I-83 (Baltimore-Harrisburg Expressway) over Padonia Road.

This project also includes the widening of Padonia Road to five (5) lanes at the bridge to include an eastbound left turn lane to the ramp to I-83 North, widening of the ramp from I-83 South to Padonia Road; extension of the acceleration lanes for the Padonia Road entrance ramps; and extension of the 12’ x 6’’ concrete box culvert carrying the branch of Beaver Run in the interchange area.

Utility relocation work is underway within the interchange area as of summer 2018. There will be temporary daytime lane closures 9 a.m. - 3 p.m. along Padonia Road in the vicinity of the bridge and utility crews will work along interchange ramps with traffic cones in place to guide motorists away from workers and equipment.

TRAFFIC ALERT
In late summer/early fall, on a date to be announced, MDOT SHA and the contractor will close the left-turn ramp from eastbound Padonia Road to northbound I-83 for 24 hours a day, seven days a week for the duration of the bridge construction work. Motorists traveling from Mays Chapel to northbound I-83 and destinations north of Hunt Valley will be detoured past the interchange to southbound Deereco Road/Greenspring Drive to the Timonium Road interchange to reach the ramp to northbound I-83.

All other interchange ramps will remain open during weekday peak travel hours.

Padonia Road will be narrowed to one lane eastbound and two lanes westbound in the vicinity of the interchange during construction work.

There will be temporary lane closures and lane shifts along I-83 and Padonia Road 9 a.m. - 3 p.m. Monday - Friday and 8 p.m. - 5 a.m. Sunday - Thursday nights.

Late night temporary ramp closures and traffic stops/detours on Padonia Road for activities such as bridge demolition and support beam setting may take place between 10 p.m. and 5 a.m.

No temporary lane closures or ramp closures will occur on Padonia Road or I-83 during the Maryland State Fair.
 
5/15/2018MDOT SHA awarded the project contract to contractor Milani Construction, LLC of Hagerstown, MD. Low Bid: $18,937,777.00

This project, located in Baltimore County, is for the replacement of the existing dual bridge on I-83 (Baltimore-Harrisburg Expressway) over Padonia Road, and extension of the 12’ x 6’’ concrete box culvert carrying the branch of Beaver Run.

This project also includes the widening of Padonia Road to five (5) lanes at the bridge to include an eastbound left turn lane to the ramp to I-83 North, widening of the ramp from I-83 South to Padonia Road and extension of the acceleration lanes for the Padonia Road entrance ramps.
 
5/1/2018Utility companies are performing utility line relocation work within the I-83/Padonia Road interchange area, this work is being done in advance of the bridge replacement project start in summer 2018.
 
4/12/2018MDOT SHA opened the bids for the project contract. The apparent low bid is under review.
 
2/13/2018MDOT SHA advertised the project for bidders. Bids from contractors to be opened 3/8/18.
 
2/13/2018MDOT SHA project team members attended a regular meeting of the Greater Timonium Community Council (GTCC) to present the I-83 bridge project information and anticipated schedule for construction, beginning mid-2018.
 
12/4/2017Created I-83 bridge project newsletter and sent a mass mailing to residents and businesses in the vicinity of the interchange.

The newsletter is posted under "Documents" on this site.
 
9/27/20179/27/2017 - Engineers are currently analyzing the hydraulics of the Branch of Beaver Run at the interchange to determine the size of the replacement structure.
 
6/21/20176/21/2017 - Project Engineering and coordination with State and Federal agencies is currently underway. Design efforts are approximately 60% complete.
 
7/28/20157/28/2015 - Project Engineering underway.
 
1/1/2013Engineering underway.
 


Events

   Community Event/Meeting

Date:

2/13/2018   (View Document)
Location:BCPL Cockeysville Branch Library, Cockeysville ,MD 21030
 
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202