Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Baltimore Project Number:BA013_51
CO 2500 CROSBY ROAD IHB - BRIDGE 0312500 OVER I-695
Status
8/1/2018CONSTRUCTION TRAFFIC ALERT - LATE SUMMER 2018

MDOT SHA's contractor is replacing the two-lane Crosby Road Bridge over I-695 in Catonsville. The bridge replacement project, which is located along I-695 between the US 40 and I-70 interchanges, began summer 2017 and will be done in two stages, with one-half of the new bridge constructed at a time.

August 2018 Traffic Advisory:

In mid-August, on or after 9 p.m. Friday August 10, 2018 there will be temporary single and double lane closures and temporary traffic stoppages on the I-695 inner and outer loops underneath the Crosby Road bridge to allow construction crews to set steel girders for the new bridge across all lanes of I-695.

This schedule is weather permitting and subject to change. Portable digital message signs will alert travelers in advance of the work.

Crews will work overnight and early morning hours from Friday night, August 10 until Thursday morning, August 15.

Friday night, August 10: Single left lane closure 9 p.m., then a double left lane closure at 11 p.m. until 7 a.m. Saturday morning.

Saturday night, August 11: Single left lane closure 9 p.m., then a double left lane closure at 11 p.m. until 9 a.m. Sunday morning.

Sunday night, August 12 - Wednesday night, August 15: Single left lane closure 8 p.m., then a double left lane closure at 10 p.m. until 5 a.m. the next day.

There will be periodic traffic "drags" to slow traffic on I-695 and then total traffic stoppages by Maryland State Police. This will allow crews to move the steel girders over all lanes of I-695 and then set the girders in place for the new bridge. The total stoppages last approximately 15 minutes at a time.

 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Complete
Right-of-Way Complete
Construction Summer 2017 Fall 2018
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic: Summer 2019
 
Status Updates
 
8/1/2018CONSTRUCTION TRAFFIC ALERT - LATE SUMMER 2018

MDOT SHA's contractor is replacing the two-lane Crosby Road Bridge over I-695 in Catonsville. The bridge replacement project, which is located along I-695 between the US 40 and I-70 interchanges, began summer 2017 and will be done in two stages, with one-half of the new bridge constructed at a time.

August 2018 Traffic Advisory:

In mid-August, on or after 9 p.m. Friday August 10, 2018 there will be temporary single and double lane closures and temporary traffic stoppages on the I-695 inner and outer loops underneath the Crosby Road bridge to allow construction crews to set steel girders for the new bridge across all lanes of I-695.

This schedule is weather permitting and subject to change. Portable digital message signs will alert travelers in advance of the work.

Crews will work overnight and early morning hours from Friday night, August 10 until Thursday morning, August 15.

Friday night, August 10: Single left lane closure 9 p.m., then a double left lane closure at 11 p.m. until 7 a.m. Saturday morning.

Saturday night, August 11: Single left lane closure 9 p.m., then a double left lane closure at 11 p.m. until 9 a.m. Sunday morning.

Sunday night, August 12 - Wednesday night, August 15: Single left lane closure 8 p.m., then a double left lane closure at 10 p.m. until 5 a.m. the next day.

There will be periodic traffic "drags" to slow traffic on I-695 and then total traffic stoppages by Maryland State Police. This will allow crews to move the steel girders over all lanes of I-695 and then set the girders in place for the new bridge. The total stoppages last approximately 15 minutes at a time.

 
5/9/2018CONSTRUCTION UPDATE - SPRING/SUMMER 2018

MDOT SHA is replacing the two-lane Crosby Road Bridge over I-695 in Catonsville. The bridge replacement project, which is located along I-695 between the US 40 and I-70 interchanges, began summer 2017 and will be done in two stages, with one-half of the new bridge constructed at a time.

Traffic Advisory: The Crosby Road bridge over I-695 will remain open during peak travel hours, with temporary lane closures and detours on the bridge allowed at other times.

Crosby Road: There may be traffic lane shifts and flagging operations on Crosby Road in the vicinity of the bridge as needed during off-peak hours.

There may be occasional single-day or overnight temporary bridge closures and detours on Crosby Road and those closures and detours will be posted in advance on digital message boards in the work zone.

I-695: There may also be temporary single or double lane closures on I-695 underneath the Crosby Road bridge during overnight hours (9 p.m. - 5 a.m. the next day Sunday - Thursday nights)

For daily traffic conditions on I-695, go to www.md511.org for current lane closures or detours.

Schedule:
Once the first half of the new bridge is ready for traffic in 2018, Phase Two will begin and traffic will be shifted onto the new bridge, the remaining side of the old bridge will be demolished and the second half of the new bridge will be constructed

Weather and other construction factors permitting, the entire bridge replacement project will be complete summer 2019.

 
4/26/2018CONSTRUCTION TRAFFIC ALERT - TEMPORARY DAYTIME BRIDGE CLOSURE MAY 1, 2018

On Tuesday, May 1 the Crosby Road bridge over I-695 will be closed to all traffic between 9 a.m. and 3 p.m. for construction work on the new bridge. The contractor will be pouring concrete for a support pier on the new bridge. Concrete work is temperature-sensitive and will be done during daylight hours.

Please plan for extra travel time in the vicinity of the bridge work zone and on the detour routes:

Westbound Crosby Road: Crosby Road to Craigmont Road south to Ingleside Ave. south to US 40 Baltimore National Pike west to N. Rolling Road north to Chesworth Rd. north back to Crosby Road

Eastbound Crosby Road: Crosby Road to Chesworth Road south to N. Rolling Road to US 40 (Baltimore National Pike) east to Ingleside Ave. north to Craigmont Road north back to Crosby Road.

In case of inclement weather, the work and bridge closure will take place on the next possible day. Digital message signs on each side of the bridge will alert drivers with a message.

This spring and summer, there may be traffic lane shifts and flagging operations on Crosby Road in the vicinity of the bridge as needed during off-peak hours.

There may be temporary lane closures on I-695 underneath Crosby Road during overnight hours (9 p.m. - 5 a.m. the next day Sunday - Thursday nights).

Weather permitting, the entire bridge replacement project will be complete summer 2019.
 
1/19/2018CONSTRUCTION UPDATE - WINTER 2018

MDOT SHA is replacing the two-lane Crosby Road Bridge over I-695 in Catonsville. The bridge replacement project began summer 2017 and construction is being done in two phases.

Phase One is underway – all traffic was shifted to one side of the old bridge and the other side of the old bridge was demolished as of fall 2017. The crossing will remain open during peak travel hours.

Construction work will continue during winter 2018 as weather permits. There may be traffic lane shifts and flagging operations on Crosby Road in the vicinity of the bridge as needed during off-peak hours. There may be temporary lane closures on I-695 underneath Crosby Road during overnight hours (9 p.m. - 5 a.m. the next day Sunday - Thursday nights).

Once the new bridge is ready for traffic, Phase Two will begin and traffic will be shifted onto the new bridge and the remaining side of the old bridge will be demolished.

Weather permitting, the new bridge will be complete fall 2018.
 
1/1/2013Engineering underway.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202