Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Montgomery Project Number:AW518_11
IS 0495 CAPITAL BELTWAY CAPITAL BELTWAY STUDY, AMERICAN LEGION BRIDGE TO W. WILSON BRIDGE
Status
12/20/2017On September, 21, 2017, MDOT SHA released a Request for Information (RFI) to solicit comments on the potential use of Public-Private Partnership (P3) to design, build, finance, operate and/or maintain improvements for congestion relief on I-495/I-95 or I-270. Interested parties are asked to respond by December 20, 2017. Additional details may be viewed by clicking on the Traffic Relief Plan link.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning Pending
Engineering
Right-of-Way
Construction
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
12/20/2017On September, 21, 2017, MDOT SHA released a Request for Information (RFI) to solicit comments on the potential use of Public-Private Partnership (P3) to design, build, finance, operate and/or maintain improvements for congestion relief on I-495/I-95 or I-270. Interested parties are asked to respond by December 20, 2017. Additional details may be viewed by clicking on the Traffic Relief Plan link.
 
8/22/2017The project remains on hold.
 
10/11/2016The project is currently on hold due to lack of funding.
 
1/7/2016The project is currently on hold due to the lack of funding.
 
1/5/2015The project is currently on hold due to the lack of funding.
 
6/19/2014The project is currenlty on hold due to the lack of funding.
 
3/10/2014The project is currently on hold due to the lack of funding.
 
1/30/2014The project is currently on hold due to the lack of funding.
 
10/7/2013The project is currently on hold due to the lack of funding.
 
7/27/2011The West Side Mobility Study was completed in Fall 2009.

The South Side Mobility Study was completed in Spring 2009.

The Capital Beltway Study for the entire length of the Maryland Beltway is currently on hold.
 
10/13/2009The Full Capital Beltway Study is still on hold. The South Side Mobility Study was completed Spring 2009, and the West Side Mobility Study is now complete.
 
2/10/2009Due to the current economic downturn, the full Capital Beltway Study is on hold. The West Side and South Side Mobility Studies, two joint studies being conducted with Virginia, are nearing completion. The main purpose of the mobility studies was to look at lane continuity and traffic operations among the different ongoing managed lane projects in the region.

The West Side Mobility Study begins just north of the Dulles Toll Road in Virginia and extends to the I-270 West Spur, and along the West Spur and I-270 to the I-370 Interchange. SHA is the lead agency for the West Side Mobility Study. This 14-mile study is evaluating connections between Virginia's High Occupancy Toll (HOT) lanes, Maryland's Capital Beltway Study, the Inter County Connector (ICC) project and the I-270 Multi-Modal Corridor Study. This study is expected to be completed by this Spring 2009.

The South Side Mobility Study beginning at at the Springfield Interchange in Virginia and ends at MD 5 (Branch Avenue) in Maryland has recently been completed. VDOTwas leading the efforts for the Southside Mobility Study. This study was also evaluating possible uses for the 11th and 12th lanes on the new Woodrow Wilson Bridge. The study reports can be found on the website, www.southsidecapitalbeltway.org.

 
11/3/2008Currently there are no activities on the full Capital Beltway Study while SHA is focusing on the two joint mobility studies with the Virginia Department of Transportation (VDOT).


The South Side Mobility Study begins at the Springfield Interchange in Virginia and ends at MD 5 (Branch Avenue) in Maryland. VDOT is leading the efforts for the South Side Mobility Study. This study is also evaluating possible uses for the 11th and 12th lanes on the new Woodrow Wilson Bridge. Phase 1 has been completed and Phase 2 studies are currently underway. The South Side Mobility Study is scheduled to be completed by Fall 2008.

The main purpose of the mobility studies will be to look at lane continuity and traffic operation among the
different ongoing projects on both the Maryland and Virginia sections of the Capital Beltway.
 
8/19/2008Currently there are no activities on the full Capital Beltway Study while SHA is focusing on the two joint mobility studies with the Virginia Department of Transportation (VDOT).

The West Side Mobility Study begins just north of the Dulles Toll Road in Virginia and extends to the I-270 West Spur, and along the West Spur and I-270 to the I-370 Interchange. SHA is the lead agency for the West Side Mobility Study. This 14 mile study is evaluating connections between Virginia's High Occupancy Toll (HOT) lanes, Maryland's Capital Beltway Study, the Inter County Connector (ICC) project and the I-270 Multi-Modal Corridor Study. This study is expected to be completed by Summer 2008.

The South Side Mobility Study begins at the Springfield Interchange in Virginia and ends at MD 5 (Branch Avenue) in Maryland. VDOT is leading the efforts for the Southside Mobility Study. This study is also evaluating possible uses for the 11th and 12th lanes on the new Woodrow Wilson Bridge. The South Side Mobility Study is scheduled to be completed by Fall 2008.

The main purpose of the mobility studies will be to look at lane continuity and traffic operation among the
different ongoing projects on both the Maryland and Virginia sections of the Capital Beltway.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202