Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Allegany Project Number:AL465_51
IS 0068 NATIONAL FREEWAY BRIDGE 0109300 OVER MD 639
Status
7/9/2019This project is at 73% complete. It is estimated to be complete by mid fall. The most recent work completed has been Girders, Deck Pans, and 90% of Deck Epoxy Steel in place for Phase 3.

The work currently underway is completing reinforcing the steel on Phase 3 deck. Two pours scheduled for July 11th and 15th to complete Phase 3 Deck, will be moving onto Parapet and Approach construction after that.

WB Right Lane Closures at night for each of the two pours for phase 3 deck and periodic flagging will occur on Willowbrook Road until we are ready to move to Phase 4.

 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Complete
Right-of-Way
Construction Spring 2018 Fall 2019
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
7/9/2019This project is at 73% complete. It is estimated to be complete by mid fall. The most recent work completed has been Girders, Deck Pans, and 90% of Deck Epoxy Steel in place for Phase 3.

The work currently underway is completing reinforcing the steel on Phase 3 deck. Two pours scheduled for July 11th and 15th to complete Phase 3 Deck, will be moving onto Parapet and Approach construction after that.

WB Right Lane Closures at night for each of the two pours for phase 3 deck and periodic flagging will occur on Willowbrook Road until we are ready to move to Phase 4.

 
6/7/2019This project is 70% complete with an estimated completion date of early Fall.

The work completed in the past month includes;

Complete Phase 2 and moved onto Phase 3

Installed E&S controls for Phase 3 and completed pouring both abutments, both pier footings, Pier 2 and Footing for East Wing Wall of Phase 3


The work currently underway includes;

Excavating for Phase 3 West Wing Wall Footing and Dowels for Pier 1, removing forms from Pier 2 to Pier 1 pour

There will be periodic flagging on Willowbrook Road until we are ready to move to Phase 4.
 
4/4/2019This project is currently 60% complete.

Current Work:
Completed placement of concrete for Phase 2 bridge deck.

Upcoming Work:
Install forms and place concrete for new parapet wall.
Backfill abutment areas.
Pave new bridge approach.
Traffic switch to Phase 3 anticipated to take place in approximately two months.

 
1/14/2019This project is currently 50% Complete

Current Work:
Work continuing through winter as weather allows.
Completed removal of existing structure for Phase 2.
Placing concrete for new abutments and wing wall footer.
Forming new pier and placing reinforcing steel.
 
9/24/2018This project is currently 27% Complete

Current Work
Completed Phase 1 pier construction.

Upcoming Work
Install structural steel girders.
Complete backwalls for Phase 1 abutments.

 
1/1/2016Engineering underway. Construction to begin during current fiscal year.
 
1/1/2001They are currently working overnight to install the MOT (grinding rumble strips, installing signs, concrete barrier walls, and pavement markings) for Phase 1. In this phase, demo and deck replacement will take place in the EB and WB center lanes. Traffic will use the slow lanes and shoulders in each direction.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202