Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Allegany Project Number:AL445_11
US 0220 MCMULLEN HIGHWAY SRI - MD 53 INTERSECTION/CRESAPTOWN AREA TO VIRGINIA STATE LINE
Status
11/21/2017A Public Meeting has been scheduled to present results of detailed studies completed on Alternative 2 Modified. The meeting will be held:

Tuesday, December 5, 2017 5:00 PM to 7:30: PM
(Snow Date: Monday, December 11, 2017)
Bel Air Elementary School (Cafeteria)
14401 Barton Blvd SW
Cumberland, MD 21502.


Additional details may be viewed in the November 2017: US 220 Project Planning Study Newsletter. Maps and exhibits of the preliminary alternatives, traffic data, and potential impacts will be on display, and team members will be available to answer project-related questions. There will be no formal presentation. You may arrive at any time during meeting hours and walk through at your own pace.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning Underway 2020
Engineering
Right-of-Way
Construction
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
11/21/2017A Public Meeting has been scheduled to present results of detailed studies completed on Alternative 2 Modified. The meeting will be held:

Tuesday, December 5, 2017 5:00 PM to 7:30: PM
(Snow Date: Monday, December 11, 2017)
Bel Air Elementary School (Cafeteria)
14401 Barton Blvd SW
Cumberland, MD 21502.


Additional details may be viewed in the November 2017: US 220 Project Planning Study Newsletter. Maps and exhibits of the preliminary alternatives, traffic data, and potential impacts will be on display, and team members will be available to answer project-related questions. There will be no formal presentation. You may arrive at any time during meeting hours and walk through at your own pace.
 
9/26/2017The Maryland Department of Transportation State Highway Administration has restructured the US 220 Project Planning Study in response to public concerns about property impacts and costs associated with alternatives presented at the December 9, 2015 Public Workshop. MDOT SHA has retained Alternative 1, the No Build Alternative, dropped from consideration all of the "build" alternatives presented at the 2015 Public Workshop and begun detailed study of a new concept, Alternative 2 Modified. The new alternative combines Transportation System Management (TSM) with targeted localized roadway and intersection improvements in commercial areas within Cresaptown and along MD 53 near Country Club Mall. Sidewalk and shoulder improvements also are proposed in focused areas along both corridors. A detailed description of Alternative 2 Modified is included in the July 2017 US 220 Project Planning Study Newsletter located on the "Documents" page. A map of the alternative may be viewed on the "Maps" page.
 
8/30/2016On Friday May 27th SHA representatives gave a presentation to the Appalachian Regional Commission (ARC): The purpose of the presentation was to update the ARC on the US 220 project and obtain feedback from the commission. To view display materials, click on the documents tab.
 
12/17/2015Approximately 164 people attended the Informational Workshop held on December 9th, 2015 at the Bel Air Elementary school 14401 Barton Blvd., SW Cumberland MD between 5:30 pm - 8:00pm. While there was no formal presentation, team members were available to answer questions and concerns related to the US 220 study. Comments received will be reviewed over the coming months.
 
3/11/2015The project team has begun the Tier II portion of the study. The purpose and need package has been approved by the following agencies (EPA, COE, USFWS, and MDE). We are currently awaiting approval from Federal Highway Administration (FHWA). The team is preparing for an Alternatives Public Workshop.
 
5/14/2014The project team has finalized the Environmental Document for the US 220 Tier I Study. The document is currently on public review with a comment period ending May 19, 2014. Once FHWA approval has been recieved, the Tier II portion of the study will begin.
 


Events

   Informational Public Workshop

Date:

12/5/2017
Location:14401 Barton Blvd SW , Cumberland ,MD 21502
 
   Informational Public Workshop

Date:

12/9/2015   (View Document)
Location:14401 Barton Blvd SW, Cumberland ,MD 21502
 
   Alternatives Public Workshop

Date:

6/15/2015
Location:14401 Barton Blvd SW, Cumberland ,MD 21502
 
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202