Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Allegany Project Number:AL345_21
MD 0831 C MD 831C OVER JENNINGS RUN
Status
10/18/2018Engineering design is ongoing. Addressing comments from the permitting agencies.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Underway 2019
Right-of-Way
Construction
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
10/18/2018Engineering design is ongoing. Addressing comments from the permitting agencies.
 
7/9/2018Continuing with engineering design. Revisions to documents for environmental permits is ongoing.
 
3/28/2018MDOT SHA presented Allegany County with different bridge options for the new bridge that could accommodate one travel lane with a separated pedestrian walkway as requested by the public at a meeting held in December 2016. After reviewing the options, the County expressed their desire for a two lane bridge without pedestrian accommodations. As per the County’s request, MDOT SHA developed a two lane bridge option without pedestrian accommodation, which the County accepted. MDOT SHA made the County aware that the accepted option requires additional environmental permitting which will postpone the project advertisement for public bids until Fall of 2019.
 
12/13/2017Engineering design is ongoing. Easements and Right of Ways are anticipated for this project.
 
9/7/2017The project design is past 30% completion. The coordination for required environmental permits is ongoing. The project impact evaluation is underway for determining easement needs during construction.
 
5/25/2017Preliminary engineering is ongoing and is approaching 30% design completion.
 
2/16/2017Public meeting was held on December 22, 2016 at Solid Rock Independent Baptist Church (12510 Corrigan Dr. NW, Corriganville, MD 21524). At the meeting, Allegany County offered to take over the ownership of the bridge and approach roadway if SHA would replace the superstructure with something similar to a Bailey bridge that would accommodate one lane of traffic and pedestrians.
 
11/22/2016State Highway Administration (SHA) is holding a public meeting for the subject project on December 13, 2016 from 5:30 p.m. to 7:30 p.m. at Solid Rock International Baptist Church (12510 Corrigan Dr. NW, Corriganville, MD 21524). This informational meeting will update the public with project information and provide attendees an opportunity to discuss project details. A formal presentation will begin at 6:00 p.m. SHA representatives will be available to answer project related questions.
 
1/1/2016Engineering underway.
 


Events

   Informational Public Workshop

Date:

12/13/2016
Location:12510 Corrigan Dr. NW, Corriganville ,MD 21524
 
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202