Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Anne Arundel Project Number:AA580_56
MD 0175 ANNAPOLIS ROAD REECE ROAD AND MAPES ROAD/CHARTER OAKS BOULEVARD
Status
9/13/2017The contractor, Peak Incorporated, has implemented Phase 2 of the traffic switch onto the new lanes. The excavation of the storm pond, located at the intersection of Reece Road and MD 175 is almost complete. Verizon continues to relocate their fiber optic cables. Pipe work continues the westbound shoulder, on the storm ponds throughout the project and moving of utilities.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering
Right-of-Way Complete
Construction Fall 2014 Spring 2018
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic: Fall 2018
 
Status Updates
 
9/13/2017The contractor, Peak Incorporated, has implemented Phase 2 of the traffic switch onto the new lanes. The excavation of the storm pond, located at the intersection of Reece Road and MD 175 is almost complete. Verizon continues to relocate their fiber optic cables. Pipe work continues the westbound shoulder, on the storm ponds throughout the project and moving of utilities.
 
7/12/2017During daytime hours, the contractor, Peak Incorporated, is working on the new hiker/biker trail. They are also working on drainage and clearing of tree’s in the buffer area. During nighttime work, crews are installing storm pipes at the intersection of MD 175 and Mapes. Work also continues on the new shoulder, storm ponds and the moving of utilities.
 
1/30/2017The contractor, Peak Incorporated, is currently replacing sewer lines on northbound MD 175. Most work is being done during the overnight hours. The security fence is complete and the drainage and bike /pedestrian improvements are almost complete. The road widening is being held up until all utilities are moved out of the way.
 
10/21/2016The contractor continues to work on drainage throughout the project limits.

The eastbound right turn lane between 20th Street and Reece Road on MD 175 is almost complete and will help reduce travel delays on MD 175. Work continues on the new shoulder, storm ponds, utilities and signal relocations.
 
8/10/2016The contractor is working on the eastbound right turn lane between 20th Street and Reece Road on MD 175. This lane will help reduce the backups on MD 175. Continuing eastbound MD 175, between Reece Road to Mapes Road, the contractor is working on the new shoulder. Work is ongoing on the storm ponds, utilities and signal relocations.
 
7/15/2016Contractor continues working on storm pond, storm drains, curb and gutter work, signals work and hiker/biker path. There is also night work to install the new sanitary sewer line.
 
5/9/2016Crews continue to work on sewer, utility and signal relocations on MD 175 from Reece Road to Mapes Road/Charter Oaks Boulevard. Excavation and drainage work continue.
 
1/13/2016Currently crews are working on sewer, utility and signal relocations on MD 175 from Reece Road to Mapes Road/Charter Oaks Boulevard. The excavation and drainage work continues in this area. Motorists should expect occasional lane closures and construction vehicles entering and exiting MD 175.
 
8/26/2015Construction continues along eastbound MD 175. Excavation, drainage and utility work is continuing in this area through 2015. Motorists should expect occasional lane closures and construction vehicles entering and exiting MD 175 between Reece Road and Mapes Road/Charter Oaks Boulevard.
 
4/15/2015Construction is underway along eastbound MD 175. Excavation, drainage and utility work will continue in this area through 2015 as approximately 30,000 cubic yards of material are removed. Motorists should expect occasional lane closures and construction vehicles entering and exiting MD 175 between Reece Road and Mapes Road/Charter Oaks Boulevard.
 
1/27/2015Relocation of security fence has been completed. Widening and intersection reconstruction will begin early 2015 following current utility work.
 
11/18/2014The intersection improvements at MD 175 and Mapes Road and MD 175 at Reece Road have been fully funded for construction. The work was advertised as one project in January 2014 and a construction contract was awarded in the spring. Construction can begin following relocation of security fence, clearing along MD 175 and initial utility work.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202