County:Anne Arundel Project Number:AA510_22
MD 0198 LAUREL FT MEADE ROAD RUSSET GREEN EAST TO MD 295 NB RAMP - PHASE 1
Status
5/31/2017The latest design is currently undergoing a study to make sure the overall project goals are met and to reduce overall construction costs where possible. Due to the study, the 90% design completion milestone will be moved to Fall 2017. Funding for right-of way acquisition, utility relocations, and construction has not been allocated at this time.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning Complete
Engineering Underway Pending
Right-of-Way
Construction
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic: Spring
 
Status Updates
 
5/31/2017The latest design is currently undergoing a study to make sure the overall project goals are met and to reduce overall construction costs where possible. Due to the study, the 90% design completion milestone will be moved to Fall 2017. Funding for right-of way acquisition, utility relocations, and construction has not been allocated at this time.
 
9/13/2016Design activities are progressing and the 65% design milestone was reached in July 2016. The 90% design milestone is scheduled to be reached in Spring 2017. The project is currently funded for Preliminary Engineering. Funding for Right-of Way Acquisition, Utility Relocations, or Construction has not been allocated at this time.
 
1/1/2013Engineering underway.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202