Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Anne Arundel Project Number:AA436_54
MD 0175 ANNAPOLIS ROAD WEST OF REECE ROAD TO EAST OF DISNEY ROAD
Status
8/16/2017Kibler Construction Company, has completed the clearing and grubbing along the.53-mile section of road encompassing the project on the MD 175 corridor. The contractor has installed a barrier wall from Clark Rd to Reese Rd. They are working behind the barrier wall on the storm water management system where they continue to install pipe between MacArthur and Clark roads. At night Kibler has been excavating, laying pipe and paving F-Line Road at MD 175 to create the new G-Line Road.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning
Engineering Complete
Right-of-Way
Construction Fall 2016 Spring 2020
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
8/16/2017Kibler Construction Company, has completed the clearing and grubbing along the.53-mile section of road encompassing the project on the MD 175 corridor. The contractor has installed a barrier wall from Clark Rd to Reese Rd. They are working behind the barrier wall on the storm water management system where they continue to install pipe between MacArthur and Clark roads. At night Kibler has been excavating, laying pipe and paving F-Line Road at MD 175 to create the new G-Line Road.
 
6/12/2017Kibler Construction Company, is still clearing and grubbing trees along the.53-mile section of road encompassing the project on the MD 175 corridor. The contractor has installed a barrier wall from Clark to Reese Rd. They are working behind the barrier wall on the storm water management system where they continue to install pipe between MacArthur and Clark roads.
 
4/12/2017On the MD 175 corridor, Kibler Construction Company, continues to clear and grub trees along the.53-mile section of road encompassing the project. The contractor is also working on the storm water management system where they are installing pipe between MacArthur and Clark roads. The perimeter fence has also been replaced.
 
1/30/2017The Maryland Department of Transportation’s State Highway Administration (SHA) continues transportation investments in western Anne Arundel County on MD 175 around Fort George G. Meade. The latest project along the MD 175 corridor will widen the .53 mile section of road and reduce congestion between Reece Road and Disney Road.

The $43.7 million construction project is being built by Kibler Construction Company of Finksburg, MD. Crews will widen of MD 175 from a two-lane undivided highway to a six lane divided highway with a median, a hiker/biker trail, sidewalks and on-road bicycle facilities. Upon completion, it will improve the infrastructure of MD 175 that 52,000 employees rely on every day.
 
1/1/2013Engineering underway.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202