Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Anne Arundel Project Number:AA436_21
MD 0175 ANNAPOLIS ROAD MD 295 TO MD 170
Status
11/27/2017MD 175 from Disney to Reece Road is now under construction.

Please see the individual project pages for further updates about MD 175 at MD 295, MD 175 from Disney Rd to Reece Rd, and MD 175 from Mapes Rd to Nevada Ave.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning Complete
Engineering Underway Pending
Right-of-Way
Construction
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
11/27/2017MD 175 from Disney to Reece Road is now under construction.

Please see the individual project pages for further updates about MD 175 at MD 295, MD 175 from Disney Rd to Reece Rd, and MD 175 from Mapes Rd to Nevada Ave.
 
12/16/2016Please see the individual project pages for further updates about MD 175 at MD 295, MD 175 from Disney Rd to Reece Rd, and MD 175 from Mapes Rd to Nevada Ave.
 
10/12/2016Please see the individual project pages for further updates about MD 175 at MD 295, MD 175 from Disney Rd to Reece Rd, and MD 175 near MD 32.
 
4/13/2016Design continues on the segment of MD 175 over MD 295. Plans are 65 percent complete. Coordination with utilities in the area of the interchange continues. A Spring newsletter is being prepared for distribution.
 
2/8/2016Design continues on the segment of MD 175 over MD 295. Plans are 65 percent complete. Coordination with utilities in the area of the interchange continues.
 
11/17/2015Design continues on the segment of MD 175 over MD 295. Coordination with utilities in the area of the interchange is ongoing.
 
9/21/2015Design continues on the segment of MD 175 over MD 295. Coordination with BGE Gas in the area of the interchange is underway.
 
7/20/2015Design continues on the segment of MD 175 over MD 295. Coordination with utilities in the area of the interchange is underway.
 
6/29/2015Design continues on the segment of MD 175 over MD 295. Coordination with the National Park Service is underway for proposed stream restoration.
 
5/15/2015Design continues on the segment of MD 175 over MD 295. Additional topographic surveys are being performed. Right-of-way needs have been identified and affected property owners have been contacted. A project newsletter will be mailed to residents in the project area this summer.
 
4/17/2015Design continues on the segment of MD 175 over MD 295. Coordination with utilities in the area of the interchange is underway.
 
1/14/2015Design continues on the segment of MD 175 over MD 295. Surveys are being performed in order to update the topographic files. Utility test holes are being dug to determine the exact location of underground utilities.
 
8/19/2014The Corridor Project will be broken into Segments.

Segment 1 will be the Interchange of MD 175 at MD 295 (Baltimore/Washington Parkway).

Borings are being taken in order to analyze the soils for the new bridge and storm water management facilities in the area of the Interchange.
 
5/10/2012Planning Phase Update: Location Design Approval was obtained on February 27, 2012 for the MD 175 Project.

Design Phase Update: The State Highway Administration held the Preliminary Investigation Meeting (30% design complete) for the MD 175 Corridor on November 16, 2011. We are addressing comments which came out of that meeting, and will break-out Phase 1 to proceed with design to Semi-Final Review (65% complete). Phase 1 of the Corridor is the MD 175 at MD 295 Interchange. Semi-Final Review for the interchange is expected in Winter of 2013.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202