Project Schedule & Events

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Anne Arundel Project Number:AA221_51
US 0050 JOHN HANSON HIGHWAY IHB - MD 70 TO MD 2 (NORTH)
Status
10/31/2017The Maryland Department of Transportation State Highway Administration (MDOT SHA) has begun the project to provide seven travel lanes between Ridgley Ave overpass to the MD 2/MD 450 interchange. The existing median barrier will be removed and replaced to provide four travel lanes in the eastbound direction and three travel lanes in the westbound direction.

Beginning Sunday November 5, contractor Joseph B Fay Company of Glen Burnie, will begin restriping the Bridge. This restriping project will last for approximately one week, ending on Sunday November 12, weather permitting. Restriping will begin on westbound US-50, ultimately creating 11-foot travel lanes, and an additional fourth lane in the eastbound direction. Restriping will be completed overnight, resulting in overnight lane closures. Precast concrete barriers will be set up beginning November 8, in coordination with the restriping.

 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning Complete
Engineering Complete
Right-of-Way Underway 2022
Construction Summer 2017 Fall 2018
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
10/31/2017The Maryland Department of Transportation State Highway Administration (MDOT SHA) has begun the project to provide seven travel lanes between Ridgley Ave overpass to the MD 2/MD 450 interchange. The existing median barrier will be removed and replaced to provide four travel lanes in the eastbound direction and three travel lanes in the westbound direction.

Beginning Sunday November 5, contractor Joseph B Fay Company of Glen Burnie, will begin restriping the Bridge. This restriping project will last for approximately one week, ending on Sunday November 12, weather permitting. Restriping will begin on westbound US-50, ultimately creating 11-foot travel lanes, and an additional fourth lane in the eastbound direction. Restriping will be completed overnight, resulting in overnight lane closures. Precast concrete barriers will be set up beginning November 8, in coordination with the restriping.

 
1/1/2016Planning underway. Engineering to begin during current fiscal year.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information