County:Anne Arundel Project Number:AA221_51
US 0050 JOHN HANSON HIGHWAY IHB - MD 70 TO MD 2 (NORTH)
Status
6/19/2018Contractor currently installing neoprene trough under bridge for the next 2 weeks. Lighting and signage being installed on bridge and will be completed by 6/28. Rumble strips to be installed 6/24. Foam finger joints to be installed 6/27 and 6/28. Fay Construction anticipates to be completely finished by the end of July.
 
Phase Time Frame As Defined in the Consolidated Transportation Program (Funded Year Displayed in CTP)
What's Involved? Estimate Begin Estimate Complete
Planning Complete
Engineering Complete
Right-of-Way Underway 2019
Construction Summer 2017 Fall 2018
Completed Milestones
Planning Phase Begin Project Planning
  Alternates Public Workshop
  Location/Design Public Hearing
  Location/Design Approval
Engineering Phase Begin Preliminary Engineering
  Geometric Design Approval
  Final Engineering Complete
  Advertised for Bid    
Construction Phase For General Lane Closure Information click HERE
  Begin Construction (Notice To Proceed)
  Open to Traffic:
 
Status Updates
 
6/19/2018Contractor currently installing neoprene trough under bridge for the next 2 weeks. Lighting and signage being installed on bridge and will be completed by 6/28. Rumble strips to be installed 6/24. Foam finger joints to be installed 6/27 and 6/28. Fay Construction anticipates to be completely finished by the end of July.
 
4/16/2018 Fay Construction is going to begin pulling barrier wall on the bridge. They will continue pulling barrier wall through the week of April 16. Once the temporary barrier walls have been moved drums will be ran down the 4th lane until we have the temporary paving and striping done. Temporary paving is scheduled to start on Monday, April 16th . Fay plans to have the bridge in final configuration by April 25. The final paving and striping will be done by May 15th.
 
2/15/20182/15/2018
The Maryland Department of Transportation State Highway Administration (MDOT SHA) continues to work the project to provide seven travel lanes between Ridgely Ave overpass to the MD 2/MD 450 interchange. Mill and Paving to be done week of Feb. 20 at night Westbound. Precast median barriers to go in beginning of March.
 
2/8/20182/8/2018
The Maryland Department of Transportation State Highway Administration (MDOT SHA) continues to work the project to provide seven travel lanes between Ridgely Ave overpass to the MD 2/MD 450 interchange. Hand chipping done on the bridge deck is complete. Inlets and drainage pipes are being installed along the bridge. Work on the platform under the bridge continues.
 
10/31/2017The Maryland Department of Transportation State Highway Administration (MDOT SHA) has begun the project to provide seven travel lanes between Ridgley Ave overpass to the MD 2/MD 450 interchange. The existing median barrier will be removed and replaced to provide four travel lanes in the eastbound direction and three travel lanes in the westbound direction.

Beginning Sunday November 5, contractor Joseph B Fay Company of Glen Burnie, will begin restriping the Bridge. This restriping project will last for approximately one week, ending on Sunday November 12, weather permitting. Restriping will begin on westbound US-50, ultimately creating 11-foot travel lanes, and an additional fourth lane in the eastbound direction. Restriping will be completed overnight, resulting in overnight lane closures. Precast concrete barriers will be set up beginning November 8, in coordination with the restriping.

 
1/1/2016Planning underway. Engineering to begin during current fiscal year.
 


Events

No events found at this time.
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202