Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Prince George's Project Number:PG253_11
US 0001 BALTIMORE AVENUE SOUTH GATE OF UNIVERSITY OF MD (REGENTS DRIVE) TO SUNNYSIDE AVENUE
Maps
Selected Alternate
This is a PDF Attachment, double click to view:August 2005: US 1 - College Park Selected Alternative Maps from FONSI - 100 scale August 2005: US 1 - College Park Selected Alternative Maps from FONSI - 100 scale

August 2005: Maps included in the US 1 - College Park Finding of No Significant Impact Statement (FONSI).
This is a PDF Attachment, double click to view:March 2006:  Selected Alternative Four-Lane Divided Alternate with Cherry Hill Road At-Grade Intersection Option B. March 2006: Selected Alternative Four-Lane Divided Alternate with Cherry Hill Road At-Grade Intersection Option B.

elected Alternative includes improvements along US 1, at the Cherry Hill Road/ US 1 Intersection and at I-495 Capital Beltway.

US 1 Mainline: US 1 would be reconstructed to a 4-lane divided roadway to provide two travel lanes in each direction separated by a 16-foot raised landscaped median that would narrow to four feet at intersections to accommodate turning vehicles. Outside travel lanes would be 16 feet in each direction to accommodate on-street bicyclists. Five-foot sidewalks, and a three-foot utility easement would be constructed along each side of the roadway. Either pavers or street streets would be installed/planted in areas located outside the curb ranging from 2-6 feet, as right-of-way allows.

Cherry Hill Road/US 1 Intersection Option B: Improvements would result in a 10-lane footprint for US 1 and a five-lane footprint for Cherry Hill Road. An additional northbound and southbound through lane would be constructed on US 1. A left turn lane would be added on Cherry Hill Road onto US 1 northbound.

I-495 /Capital Beltway Loop Ramp: The loop ramp would be realigned as a signalized T-intersection. The intersection would include a triple-right-turn which would allow three northbound through lanes to continue across the Capital Beltway overpas
Study Area
This is a PDF Attachment, double click to view:US1 CP Study Area July 2005 US1 CP Study Area July 2005

Typical Sections
This is a PDF Attachment, double click to view:US1 CP Typical July 2005.pdf US1 CP Typical July 2005.pdf

Vicinity Maps
This is a PDF Attachment, double click to view:US1 CP Location Map July 2005 US1 CP Location Map July 2005

 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202