Project Information

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Washington Project Number:WA883_21
MD 0056 BIG POOL ROAD BRIDGE 2109600 OVER MD I-70
MD 0056  BIG POOL ROAD BRIDGE 2109600 OVER MD I-70 Picture
Project Name:
MD 56, Big Pool Road

Location of Project:
BRIDGE 2109600 OVER MD I-70

Description:
Study to rehabilitate Bridge 2109600 over I-70.
 
Scope:
The bridge on MD 56 (Big Pool Road) crossing I-70 is scheduled for rehabilitation. Originally constructed in 1964, the bridge is safe for the traveling public, but the roadway surface is nearing the end of its useful service life. Should the deterioration continue, weight restrictions (reduced loads for trucks) would need to be posted to ensure safety. This would have a significant impact on the local economy and operations at the gas station. The rehabilitated bridge will provide slightly wider shoulders to improve safety and provide a travel area for cyclists. Rehabilitating the bridge at this time will save money on future maintenance spending and support safety and mobility as part of SHA’s bridge system preservation program.

Several alternatives for maintaining traffic along MD 56 during construction were considered, including maintaining two lanes of traffic across the bridge and a complete detour of MD 56. It was determined that the bridge is too narrow to maintain two lanes of traffic during construction. Closing the bridge and detouring all traffic would reduce the construction time, but the narrow width and character of the local roadways available for a detour made this alternative unacceptable. The preferred method for maintaining traffic during construction will be to have one lane of alternating traffic move through the work zone, controlled by temporary traffic signals at both ends of the bridge.

At this time no definitive construction schedule has been set, but we anticipate the project duration will last one construction season (spring-fall). SHA will make every effort to complete this project as quickly as possible while minimizing impacts to local residents and motorists.

Project Type:
BRIDGE REHABILITATION

Current Phase:Design
Funded Year :2016 How much will this project cost?
Funding Source(s):State
Last Updated On : 11/8/2017
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202