Home
Business Center
Projects & Studies
Commuter & Travel
Safety Programs
Environment & Community
Info Center
State Highway Administration
business center
Projects & Studies
commuter & travel
safety programs
environment & Community
information center
contact us

Project Information

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Frederick Project Number:FR388_21
MD 0085 BUCKEYSTOWN PIKE SOUTH OF ENGLISH MUFFIN WAY TO NORTH OF GROVE ROAD
MD 0085  BUCKEYSTOWN PIKE SOUTH OF ENGLISH MUFFIN WAY TO NORTH OF GROVE ROAD Picture
Project Name:
MD 85, Buckeystown Pike

Location of Project:
SOUTH OF ENGLISH MUFFIN WAY TO NORTH OF GROVE ROAD

Description:
Upgrade MD 85 to a multi-lane divided highway from south of English Muffin Way to north of Grove Road (2.40 miles). The project will include 6' bicycle lanes.
 
Scope:
The MD 85 Phase 1 interchange project is the first of three projects included in the "MD 85 Planning Study". The project includes reconstruction of the existing interchange at MD 85 and I-270, along with roadway improvements to MD 85 between Spectrum Drive and South of Crestwood Boulevard. Phase 2 extends from Spectrum Drive northward to tie-in with the recently-completed improvements near the MD 85/MD 355 intersection. Phase 3 of the Planning Study extends southward from Crestwood Boulevard to English Muffin Way, and includes the replacement of the bridge over Ballenger Creek.
 
What is under study:
Phase 1 of the project includes upgrading the MD 85 interchange at I-270 and the tie-ins required at Spectrum Drive and Crestwood Boulevard. The interchange design will need to be compatible with long-term improvements proposed as part of the I-270/US 15 Multi-modal Study. The two I-270 bridges over MD 85 will be removed and replaced with a longer, wider structure that can accommodate the additional lanes required on MD 85 to accommodate the design year traffic (2030).

Associated Improvement Projects:
www.marylandroads.com

Associated Projects not managed by SHA:
Shockley/Spectrum Drive Connector

Project Type:
INTERCHANGE RECONSTRUCT

Current Phase:Design
Funded Year :2003 How much will this project cost?
Funding Source(s):State/Federal
Last Updated On : 3/19/2013
 
RSS
 
 
   
 
 
Maryland Department of Transportation
707 North Calvert Street Baltimore, Maryland 21202