Project Information

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Charles Project Number:CH239_21
MD 0224 RIVERSIDE ROAD BRIDGE 0801900 OVER THORNE GUT AND BRIDGE 0802000 OVER BRANCH THORNE GUT
MD 0224  RIVERSIDE ROAD BRIDGE 0801900 OVER THORNE GUT AND BRIDGE 0802000 OVER BRANCH THORNE GUT Picture
Project Name:
MD 224, Riverside Road

Location of Project:
BRIDGE 0801900 OVER THORNE GUT AND BRIDGE 0802000 OVER BRANCH THORNE GUT

Description:
Rehabilitate Bridge 0801900 over Thorne Gut and Bridge 0802000 over Branch of Thorne Gut.
 
Scope:
The bridges on the MD 224 (Riverside Road) crossing at Thorne Gut and a Branch of Thorne Gut in Charles County are scheduled for replacement. Originally constructed in 1947, the bridges are safe for the traveling public, but are nearing the end of their useful service life. Should the deterioration continue, the bridges would need to be closed to traffic since they are already posted for reduced loads. This would impact the movement of traffic in the area since MD 224 functions as a travel route for traffic traveling along the east side of Charles County in rural areas. Replacing the bridges will save money on future maintenance spending, and support safety and mobility as a part of MDOT SHA’s bridge preservation program.

Several alternatives for maintaining traffic along MD 224 during construction were considered including maintaining traffic in a single lane with the use of a system of temporary traffic signals to alternate traffic through the work zone at the bridge while completing the bridge in two stages, and a complete detour of MD 224 traffic while completing the work in a single stage. At this time the preferred alternative will be to detour traffic during construction since it will minimize the duration of construction and its impact upon the traveling public. See the map included on this site under the maps folder.

MDOT SHA will make every effort to complete the project as quickly as possible while minimizing impacts to local residents and motorists. Construction is scheduled to begin Spring, 2018 and be completed Fall, 2018 weather permitting with the complete detour lasting approximately 10 weeks.

Project Type:
BRIDGE REHABILITATION

Current Phase:Design
Funded Year :2013 How much will this project cost?
Funding Source(s):State/Federal
Last Updated On : 11/27/2017
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202