Project Information

Project Schedule Documents Contacts Map(s) Media Feedback FAQ
 
County:Allegany Project Number:AL251_21
MD 0036 NEW GEORGES CREEK ROAD BRIDGE 0107800 OVER NORTH BRANCH
MD 0036  NEW GEORGES CREEK ROAD BRIDGE 0107800 OVER NORTH BRANCH Picture
Project Name:
MD 36, New George's Creek Road

Location of Project:
BRIDGE 0107800 OVER NORTH BRANCH

Description:
Study to Replace Bridge Deck on Bridge 0107800 over North Branch.
 
Scope:
The bridge on MD 36 (Mount Savage Road) crossing North Branch is scheduled for rehabilitation. Originally constructed in 1960, the bridge is safe for the traveling public, but the roadway surface is nearing the end of its useful service life. Should the deterioration continue, weight restrictions (reduced loads for trucks) would need to be posted to ensure safety. This could have a significant impact on the local economy. Rehabilitating the bridge at this time will save money on future maintenance spending and support safety and mobility as part of SHA’s bridge system preservation program.

Several alternatives for maintaining traffic along MD 36 during construction were considered, including maintaining two lanes of traffic across the bridge and a complete detour of MD 36. It was determined that the bridge is wide enough to maintain two lanes of traffic during construction. Closing the bridge and detouring all traffic would reduce the construction time, but the length of detour and increased travel time made this alternative unacceptable. The preferred method for maintaining traffic during construction will be to maintain a lane of traffic in each direction and complete the work in two stages of construction.

At this time no definitive construction schedule has been set, but we anticipate the project duration will last one construction season (spring-fall). SHA will make every effort to complete this project as quickly as possible while minimizing impacts to local residents and motorists.

Project Type:
BRIDGE DECK REPLACEMENT

Current Phase:Design
Funded Year :2016 How much will this project cost?
Funding Source(s):State
Last Updated On : 11/20/2017
 
RSS
 
 
   
 

RESOURCES


Maryland 511 System

Maryland 511 System:
Free Traffic
and
Travel
Information
Maryland Safe Zones
Maryland Safe Zones:
Automated Speed
Enforcement
in Highway
Work Zones
 
707 North Calvert Street Baltimore, Maryland 21202